Site work and renovation of a civil project in Lakefield, Minnesota. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
Project has been Rebid. https://www.dglobe.com/incoming/7250997-Lawmakers-hear-funding-proposals-at-Minnesota-Wests-Worthington-campus Lakefield infrastructure improvement project The city of Lakefield's bonding request deals with a series of projects related to water and road infrastructure. Lakefield's wastewater permit through the Minnesota Pollution Control Agency includes a compliance schedule, the constraints of which the city currently faces. The first requirement is the addition of a reverse osmosis system, which will remove water softeners and chlorides from the wastewater stream. The second project concerns improvements to the wastewater treatment facility in order to update the aging infrastructure and better remove contaminants from the wastewater. Funding will also go toward some consumer maintenance service replacements throughout town to eliminate significant inflow and infiltration from the sanitary sewer system. "Far more than what is on this [presentation] needs to be done," said Brian Rossow, city clerk, during his presentation to the capital investment committee. "We had to pick the worst ones to start with, because it was just not affordable to do all of the repairs that need to be done." Additionally, the city of Lakefield is seeking funds for the complete reconstruction of Minnesota 86, including sewer trunk and service replacements, which Rossow called a "daunting task." "It's pretty scary for the community because that's our main lifeline in and out of town for our residents," said Rossow. The current estimate for the Minnesota 86 project has increased from $1.15 million in March to a recent updated estimate of $1.77 million in October. Rossow stated that if trends continue, the bids for that are likely going to be even higher. The original total project estimate was about $14 million, of which Lakefield asked for a 50% match from the state, for a bonding request of $7 million. Bids on the other projects are also expected to be higher than initially projected. Current project costs are a little over $20 million, with additional funding in the form of loans and grants. "So why fund this project" Rossow asked of the committee. "First of all, we're out of time." This project has been underway for the past five years in Lakefield, which is facing a compliance date of 2023 for their wastewater permit. Rossow also cites environmental concerns and lack of affordability for the current community in Lakefield as reasons for the state to invest in their infrastructure improvement project. "We've been fortunate to see population growth over the last census period, but that won't be sustained," said Rossow. "We'll see decline if we have to increase taxes and utility rates to run an increasing cost project." Lakefield currently sits at number two on the project priority list, just behind Aurora, after being number one for several years. ________________________________________________ The Work consists of replacing in kind the grit system, the oxidation ditch equipment, and the final clarifier equipment; replacing pumps for the raw wastewater, WAS/RAS, scum, and sludge load out; replacing the raw wastewater force main, final clarifier cover, backup generator, heaters; retrofitting existing sludge storage to an aerobic digester; insulating and siding masonry block building. The opening and reading of the Bids may be modified subject to COVID-19 preventative measures. Bids will be received for a single prime Contract. Bids shall be on a lump sum basis, as indicated in the Bid Form. Bid security shall be furnished in accordance with the Instructions to Bidders. A Contractor responding to these Bidding Documents must submit to the Owner a signed statement under oath by an owner or officer verifying compliance with each of the minimum criteria in Minnesota Statutes, section 16C.285, subdivision 3. Funding Source PFA - Water Infrastructure Fund: The work shall be subject to minimum wages and labor standards in accordance with the State of Minnesota. Funding Source USDA - Rural Development: Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A - Agriculture, Rural Development, Food and Drug Administration, and Related Agencies Appropriations Act, 2017) and subsequent statutes mandating domestic preference applies an American Iron and Steel requirement to this project. All parties are required to comply with these requirements and to ensure that all iron and steel products used in this project must be produced in the United States. The term "iron and steel products" means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and construction materials." The deminimis and minor components waiver apply to this contract. The nation-wide waiver regarding the following products apply to this contract: (1) Stainless Steel Nuts and Bolts; and (2) Pig Iron and Direct Reduced Iron. Bidding Documents may be examined at the office of the City Clerk, City of Lakefield, 301 Main Street, Lakefield, MN 56150, on Mondays through Fridays between the hours of 8:00 a.m. to 4:00 p.m
Award
Water / Sewer
$5,417,200.00
Public - City
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 3, 2022
April 22, 2022
MN 86, Lakefield, MN
Related To This Project
Lakefield, MN
Bid Date: Apr 01 2022
Lakefield, MN
Bid Date: Mar 10 2022
Lakefield, MN
Bid Date: Feb 25 2020
Lakefield, MN
Bid Date: Feb 25 2022
Lakefield, MN
Bid Date: Apr 06 2023
Lakefield, MN
Bid Date: Aug 18 2023
Lakefield, MN
Bid Date: Mar 03 2022
Lakefield, MN
Bid Date: Mar 10 2022
Lakefield, MN
Bid Date: Feb 26 2021
Lakefield, MN
Bid Date: Sep 02 2022
Arlington, MN
Bid Date: Dec 14 2021
Buffalo, MN
Bid Date: Oct 21 2021
Ely, MN
Bid Date: Oct 21 2021
Isle, MN
Bid Date: Dec 17 2021
Isle, MN
Bid Date: Sep 08 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.