Demolition, site work, renovation and addition to a mixed-use development in Eugene, Oregon. Working plans call for the renovation of a educational facility; for the addition of a theater / auditorium; for the demolition of a educational facility; and for site work for a educational facility.
The owner has selected a Construction Manager. The Heritage Project will fully renovate and restore historic University Hall and Villard Hall, by eliminating deferred maintenance and creating sustainable, innovative, and flexible departmental teaching and classroom spaces that support current mathematics, theater and film study pedagogies. University and Villard Halls are the two founding buildings of the University of Oregon. Together, along with the surrounding grounds, the buildings are designated a National Historic Landmark site. Meet requirement of achieving LEED Gold level certification. The total Project budget is $79.55M. The Project is funded by state bonds and UO funds. The budget includes direct construction for surge and project renovation efforts (surge and displaced uses pre-construction and construction services are not part of CM/GC contract), and furniture and equipment procurement. There is no additional funding available. The anticipated GMP range for the Project is between $45M and $50M proportioned between the two building renovations and the exterior land improvements between the buildings. Acceptance or rejection of the final construction documents phase construction cost estimate will constitute completion of Preconstruction Phase Services. If Construction Phase Services are added to the CM/GC Contract through authorization of Early Work or acceptance of a GMP, an amendment to the GM/GC Contract will be executed. If an amendment is executed, a 100% payment bond and a 100% performance bond for the completion of the Work under an Early Work Amendment, or GMP Amendment, as applicable will be required. See Appendices F and G for sample bond forms The Project schedule anticipates a 15-month design process followed by an 18-month Project construction period. The university is requesting firms capable of managing pre-construction services for two simultaneous building design processes and concurrent construction services for two adjacent, historically significant buildings situated on a tight, historically significant campus site. An early demolition bid package is anticipated to overlap the end of the design period with projected demolition start to correspond with projected building vacations at the end of June 2023. The primary construction bid package is anticipated to be released for permit and bidding July 2023, with construction completion January 2025. CM/GC selection/contract anticipated June 2022 Programming & Conceptual Design May 2022 - August 2022 Design September 2022 - June 2023 Bidding/Permitting July 2023 - August 2023 Early Construction Package July 2023 Construction Completion January 2025 Owner reserves the right to negotiate these rates prior to the execution of the contract.
Pre-Construction/Negotiated
Educational
$79,550,000.00
Public - State/Provincial
Addition, Demolition, LEED Certification, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 11, 2022
September 14, 2023
Multiple Locations, Eugene, OR
Related To This Project
Eugene, OR
Bid Date: Mar 09 2023
Eugene, OR
Bid Date: Sep 22 2022
Eugene, OR
Bid Date: Aug 12 2022
Eugene, OR
--
Eugene, OR
Bid Date: Sep 01 2022
Eugene, OR
Bid Date: Sep 15 2022
Eugene, OR
Bid Date: Jan 12 2023
Eugene, OR
Bid Date: Jan 12 2023
Eugene, OR
Bid Date: Sep 13 2022
Eugene, OR
Bid Date: Aug 18 2022
Eugene, OR
Bid Date: Aug 17 2021
Eugene, OR
Bid Date: Jan 07 2022
Eugene, OR
Bid Date: Aug 16 2022
Eugene, OR
Bid Date: Dec 04 2018
Eugene, OR
Bid Date: Dec 03 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.