BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Long Beach, California. Completed plans call for site work for a water / sewer project.

questions 4:00 PM on August 3, 2021. The Work consists of furnishing all labor, equipment and materials necessary to complete the following work: 1. Maintain operation of the Long Beach Groundwater Treatment Plant throughout construction. Maintain operation of all influent and effluent transmission mains. 2. Furnish and maintain traffic control devices throughout potholing and construction. 3. Perform potholing operations to verify location of existing underground utilities and to measure outside diameter of existing large diameter pipelines. 4. Protect in place existing utilities including the 8-inch Crimson crude oil pipeline. 5. Excavate to expose existing large valves and appurtenant piping including linestop locations. 6. Cut interfering segments of existing underground utilities. 7. Remove and legally dispose of hazardous materials found inside abandoned 6-inch gas line and asbestos cement pipe. 8. Construct linestop assemblies, anchor blocks, and temporary bypass pipelines. Pressure test and disinfect temporary bypass pipelines. 9. Perform cleaning of interior and electromagnetic inspection of existing 54-inch SCC transmission pipeline. 10. Stage 1: Remove existing 30-inch gate valve at Location 1 and replace with 30-inch butterfly valve including appurtenant piping, accessories, and assemblies. 11. Stage 1: Remove existing 30-inch gate valve at Location 2 and replace with 30-inch butterfly valve including appurtenant piping, accessories, and assemblies. 12. Stage 1: Remove existing 24-inch gate valve at Location 3 and replace with 24-inch butterfly valve including appurtenant piping, accessories, and assemblies. 13. Stage 2: Remove existing 30-inch gate valve at Location 2 and replace with 30-inch steel spool including accessories, and assemblies. 14. Stage 2: Remove existing 24-inch gate valve at Location 3 and replace with 24-inch butterfly valve including appurtenant piping, accessories, and assemblies. 15. Pressure test and disinfect all improvements. 16. Backfill and recompact all excavations. 17. Restore pavement to preconstruction conditions Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Online Q&A No

Award

Water / Sewer

$2,399,900.00

Public - City

Site Work

32

25

5

12

Subscribe For Documents

59 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
549
Active Projects
248
Bidding Soon
3,955
All Active Projects
1,831
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 12, 2021

October 11, 2021

img_map_placeholder

Kilroy Airport Way & Redondo Ave, Long Beach, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.