BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 19, 2021 at 8:00 PM

Updated January 26, 2024

Site work and paving for a civil project in Truckee, California. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

All Requests for Information (RFIs) shall be submitted to Mike Vaughan, Project Manager, via e-mail by July 23, 2021 at 5:00 PM to mvaughan@townoftruckee.com. For more information, please contact Mike Vaughan at mvaughan@townoftruckee.com or 530-582-2923. Each bid must be accompanied by a certified or cashier's check payable to the order of the Town of Truckee, or by a bid bond executed by a corporate surety authorized to do business in the State of California in the sum of not less than 10% of the total amount of the bid, as a guarantee that the bidder will enter into the proposed contract if it be awarded to that bidder. No specific bond format is required but an example bond form is available upon request. Contractor shall be responsible for complying, and for requiring all of its subcontractors to comply, with all orders and guidelines established by any government agency pertaining to protection of workers from COVID-19 infection or transmission at all times before, during, and after work on the Project, including all orders and guidelines regarding maintaining minimum physical distances between workers. To the extent that compliance with such orders and guidelines cause delays in the performance of the work, Town shall not penalize Contractor for such delays, nor shall the Contractor be eligible for additional compensation in regards to a Delay Claim with the Town. Contractor shall remain as efficient as reasonably possible while complying with all such orders and guidelines. The bidder to whom the contract is awarded by the Town shall execute a contract and furnish a surety bond in the amount of 100% of the contract price guaranteeing the faithful performance of the contract executed by a corporate surety authorized to do business in the State of California. The surety bond shall remain in force for a period of one year after final acceptance. An additional bond for 100% of the contract price shall be furnished to secure the payment of claims for labor and materials furnished for the work executed by a corporate surety authorized to do business in the State of California. No specific bond format is required but an example bond form is available upon request. All bids are to be compared on the basis of the Engineer's Estimate of the quantities of work to be done.

Award

Roads / Highways

$4,026,007.00

Public - City

Paving, Site Work

4

7

5

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
190
Active Projects
60
Bidding Soon
1,045
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 29, 2021

September 27, 2021

Project location map

Multiple Locations, Truckee, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.