Published August 5, 2021 at 8:00 PM

Updated February 13, 2024

Site work and paving for a sidewalk / parking lot in Sycamore, Kansas. Working plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

**As of Aug 5, 2021 All BIDS rejected. Work on this project consists of removing and replacing existing sidewalk in areas and constructing new sidewalk in other areas on Sycamore, Dayton to Maple. The Contractor shall restore and reseed all disturbed areas. Every effort shall be made by the Contractor to restore disturbed areas as soon as possible. All restoration work is considered subsidiary to the bid item "Site Restoration". All work should be performed in such a manner so as to protect shrubs, trees and sod not scheduled to be removed. The Contractor shall work with property owners to ensure that cleanup and restoration work is performed to the reasonable satisfaction of the property owner. However, such agreement shall not relieve the Contractor from provisions and expectations of the contracted work to be performed. A Bid Bond in the Amount of Five Percent (5%) of the Total Bid or an Annual Bid Bond Is Required Prior to Bid Opening. The Contractor shall read and fully comprehend every aspect of the contract provisions included in this bid proposal, prior to submitting a bid for the project. Any questions prior to bid submittal should be directed to Paul Gunzelman, P.E., Project Engineer, at (316) 268-4393 or pgunzelman@wichita.gov. The work order on this project shall be issued 20 (twenty) calendar days after the date on which the contract for this project has been awarded to the successful bidder. Working days will be assessed starting the date of the work order. The work on this project shall be completed within 20 (twenty) working days from the date of beginning work and in accordance with the plans and Standard Specifications. Working days will be charged as provided for in the Standard Specifications, once the work order is issued. The non-availability of material shall not prevent working days from being assessed.

Final Planning

Sidewalks / Parking Lot

$50,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
12
Active Projects
0
Bidding Soon
257
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 30, 2021

February 4, 2022

Project location map

Multiple Locations, Sycamore, KS

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.