BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 18, 2023 at 8:00 PM

Updated January 26, 2024

Demolition, site work, paving and new construction of a bridge / tunnel in Wakarusa, Kansas. Conceptual plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

As of August 18, 2023, information regarding the award and award date has not been disclosed. Although a firm timeline for construction has not been determined, construction is not expected to start prior to 2026. *The closed solicitation has been included below for reference: Prepare Concept Plans, Field Check Plans, Utility Field Check Plans, Office Check Plans and Final Plans, Cost Estimates, and Bidding Documents. Prepare Right-of-Way Plans and Legal Documents for the Appraisal and Acquisition of necessary easements. Secure Certificates of Title for those properties from which permanent and/or temporary construction easements will be required. Provide field survey staking for easements to be appraised and acquired. Prepare a Geotechnical Engineering Report for the substructure elements of the proposed bridge. Prepare and submit all necessary applications for permits required by the Corps of Engineers, State of Kansas Department of Agriculture, Division of Water Resources and any other Federal or State Agency with permitting authority over rivers and streams in the State of Kansas Assist the Shawnee County Department of Public Works with Utility Coordination as defined in the Shawnee County Design Criteria, latest edition. Provide Construction Engineering Services. 1. In communications, always refer to the above quotation number. 2. All prices and conditions must be shown. Additions or conditions not shown on this bid will not be allowed. 3. Shawnee County reserve the right to accept or reject any part of, or all of, any bid or proposal. 4. All prices quoted are to be less Federal Excise Tax and Kansas Sales Tax. 5. Price quoted shall remain firm for ninety (90) days after bid closing date.

Conceptual

Bridges / Tunnels

$518,951.00

Public - County

Demolition, New Construction, Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
1
Bidding Soon
737
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 5, 2026

Project location map

SW Jordan Rd, Wakarusa, KS

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.