Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 18, 2023 at 8:00 PM
Updated January 26, 2024
Demolition, site work, paving and new construction of a bridge / tunnel in Wakarusa, Kansas. Conceptual plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
As of August 18, 2023, information regarding the award and award date has not been disclosed. Although a firm timeline for construction has not been determined, construction is not expected to start prior to 2026. *The closed solicitation has been included below for reference: Prepare Concept Plans, Field Check Plans, Utility Field Check Plans, Office Check Plans and Final Plans, Cost Estimates, and Bidding Documents. Prepare Right-of-Way Plans and Legal Documents for the Appraisal and Acquisition of necessary easements. Secure Certificates of Title for those properties from which permanent and/or temporary construction easements will be required. Provide field survey staking for easements to be appraised and acquired. Prepare a Geotechnical Engineering Report for the substructure elements of the proposed bridge. Prepare and submit all necessary applications for permits required by the Corps of Engineers, State of Kansas Department of Agriculture, Division of Water Resources and any other Federal or State Agency with permitting authority over rivers and streams in the State of Kansas Assist the Shawnee County Department of Public Works with Utility Coordination as defined in the Shawnee County Design Criteria, latest edition. Provide Construction Engineering Services. 1. In communications, always refer to the above quotation number. 2. All prices and conditions must be shown. Additions or conditions not shown on this bid will not be allowed. 3. Shawnee County reserve the right to accept or reject any part of, or all of, any bid or proposal. 4. All prices quoted are to be less Federal Excise Tax and Kansas Sales Tax. 5. Price quoted shall remain firm for ninety (90) days after bid closing date.
Conceptual
Bridges / Tunnels
$518,951.00
Public - County
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 5, 2026
SW Jordan Rd, Wakarusa, KS
Related To This Project
Wakarusa, KS
--
Wakarusa, KS
Bid Date: May 07 2025
Wakarusa, KS
Bid Date: Dec 23 2025
Wakarusa, KS
Bid Date: Aug 28 2023
Wakarusa, KS
Bid Date: May 24 2023
Lawrence, KS
Bid Date: Aug 29 2023
Topeka, KS
Bid Date: Sep 07 2023
Topeka, KS
Bid Date: Aug 30 2023
Andover, KS
Bid Date: Aug 17 2023
Prairie Village, KS
Bid Date: Feb 08 2024
Salina, KS
Bid Date: Aug 31 2023
Emporia, KS
Bid Date: Sep 05 2023
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
