Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a municipal facility in Topeka, Kansas. Conceptual plans call for the renovation of a municipal facility.
UPDATE : Redesign and construction of a large, jury courtroom on the 3rd floor. The project includes removal and relocation of the existing judge's bench, entry into the courtroom from judicial offices, removal of the jury box, witness stand and gallery rail; construction of a new platform, judge's bench, jury box, witness stand and gallery rail using Courtroom 4D as the architectural template. Ceiling tiles and light fixtures will be replaced due to age and damage to existing units. Carpet and paint will be updated. New electronic technology features will be installed including audio, visual and recording tools; evidence presentation systems; and video-conferencing capabilities. The included technology will allow the judge to control all technology functions within the courtroom from a single console device on the bench. A new podium will be installed which will assist in integrating all of the technology features in the courtroom. The estimated costs for the design and construction of the project based upon the actual cost of design and construction of courtroom 4D (Room 403) from KBS and TreanorHL is $334,349, inclusive of Cytek Media Systems Incorporated for Audio/Visual and Technology hardware; and the quote from Marshall Furniture for the podium is $3,500. This project was previously submitted as a 2021 CIP in our five (5) year plan. However, due to COVID and the unknown financial impact to Shawnee County, the courts made no CIP requests in FY 2021. Therefore, this project request was postponed to FY 2022. Per KBS Constructors, 15% was added to the original proposal due to increased costs of lumber and steel. Project is included Shawnee County FY 2022-2026 Budget CIP ________________________________________________________________________________________________________________________________ Redesign and construction of a large, jury courtroom on the 3rd floor. The project includes removal and relocation of the existing judge's bench, entry into the courtroom from judicial offices, removal of the jury box, witness stand and gallery rail; construction of a new platform, judge's bench, jury box, witness stand and gallery rail using Courtroom 4D as the architectural template. Ceiling tiles and light fixtures will be replaced due to age and damage to existing units. Carpet and paint will be updated. New electronic technology features will be installed including audio, visual and recording tools; evidence presentation systems; and video-conferencing capabilities. The included technology will allow the judge to control all technology functions within the courtroom from a single console device on the bench. A new podium will be installed which will assist in integrating all of the technology features in the courtroom. The estimated costs for the design and construction of the project based upon the actual cost of design and construction of courtroom 4D (Room 403) from KBS and TreanorHL is $334,349, inclusive of Cytek Media Systems Incorporated for Audio/Visual and Technology hardware; and the quote from Marshall Furniture for the podium is $3,500. This project was previously submitted as a 2021 CIP in our five (5) year plan. However, due to COVID and the unknown financial impact to Shawnee County, the courts made no CIP requests in FY 2021. Therefore, this project request was postponed to FY 2022. Per KBS Constructors, 15% was added to the original proposal due to increased costs of lumber and steel. The project is included in the county's 2022-2026 Capital Improvement Program (CIP). As of February 24, 2022, further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Municipal
$388,526.00
Public - County
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 2, 2022
To Be Determined, Topeka, KS
Related To This Project
Topeka, KS
Bid Date: Dec 07 2021
Topeka, KS
Bid Date: Feb 24 2022
Topeka, KS
Bid Date: Feb 24 2022
Topeka, KS
Bid Date: Jan 14 2022
Topeka, KS
Bid Date: Dec 21 2021
Topeka, KS
Bid Date: Sep 30 2021
Topeka, KS
Bid Date: Sep 30 2021
Topeka, KS
Bid Date: Jan 28 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.