Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 24, 2022 at 7:00 PM
Updated November 14, 2023
Renovation of a municipal facility in Topeka, Kansas. Conceptual plans call for the renovation of a municipal facility.
This project is for the overall redesign and construction of a large, jury courtroom on the 3rd floor. The project will include removal and possible relocation of the existing judge's bench, removal of the jury box, witness stand and gallery rail; construction of a new platform, judge's bench, jury box, witness stand and gallery rail using Courtroom 4D (Room 403) as the architectural template. Ceiling tiles and light fixtures will be replaced due to age and damage to existing units. Carpet and paint will be updated. New electronic technology features will be installed including audio, visual and recording tools; evidence presentation systems; and video-conferencing capabilities. The included technology will allow the judge to control all technology functions within the courtroom from a single console device on the bench. A new podium will be installed which will assist in integrating all of the technology features in the courtroom. The estimated costs for the design and construction of the project based upon the actual cost of design and construction of courtroom 4D (Room 403) from KBS and TreanorHL is $334,349, inclusive of Cytek Media Systems Incorporated for Audio/Visual and Technology hardware; and the quote from Marshall Furniture for the podium is $3,500. Per KBS Constructors, 15% was added to the original proposal due to increased costs of lumber and steel. This increase is shown in the totals below. The project is included in the county's 2022-2026 Capital Improvement Program (CIP). As of February 24, 2022, further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Municipal
$388,526.00
Public - County
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 1, 2023
To Be Determined, Topeka, KS
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
