Renovation of a municipal facility in Topeka, Kansas. Conceptual plans call for the renovation of a municipal facility.

This project is for the overall redesign and construction of a large, jury courtroom on the 3rd floor. The project will include removal and possible relocation of the existing judge's bench, removal of the jury box, witness stand and gallery rail; construction of a new platform, judge's bench, jury box, witness stand and gallery rail using Courtroom 4D (Room 403) as the architectural template. Ceiling tiles and light fixtures will be replaced due to age and damage to existing units. Carpet and paint will be updated. New electronic technology features will be installed including audio, visual and recording tools; evidence presentation systems; and video-conferencing capabilities. The included technology will allow the judge to control all technology functions within the courtroom from a single console device on the bench. A new podium will be installed which will assist in integrating all of the technology features in the courtroom. The estimated costs for the design and construction of the project based upon the actual cost of design and construction of courtroom 4D (Room 403) from KBS and TreanorHL is $334,349, inclusive of Cytek Media Systems Incorporated for Audio/Visual and Technology hardware; and the quote from Marshall Furniture for the podium is $3,500. Per KBS Constructors, 15% was added to the original proposal due to increased costs of lumber and steel. This increase is shown in the totals below. The project is included in the county's 2022-2026 Capital Improvement Program (CIP). As of February 24, 2022, further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Municipal

$388,526.00

Public - County

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
41
Bidding Soon
694
All Active Projects
295
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2023

img_map_placeholder

To Be Determined, Topeka, KS

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.