BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Orange, California. Completed plans call for the renovation of a 20,500-square-foot, 10-story above grade municipal facility.

Prefer that bids are submitted as one file, multiple files are acceptable as well. Roof re-coating preparation. Application of fluid-applied roof membrane and flashings over existing modified bituminous membrane roofing CalOptima owns a 10-story commercial office building located at 505 City Parkway West, Orange, CA 92868 and is seeking service for the rehabilitation of modified bituminous membrane roofing. The existing roof membrane on the main roof, is approximately 19,000 sf and the Penthouse Roof is approximately 1,500 sf. Further details are contained below. Roofing Rehabilitation Preinstallation Conference: Conduct conference at Project site to review methods and procedures related to roofing system. i. Meet with Owner; roofing re-coating materials manufacturer's representative; roofing re-coating Installer including project manager and foreman; and installers whose work interfaces with or affects re-coating including installers of roof accessories and roof-mounted equipment requiring removal and replacement as part of the Work. ii. Review methods and procedures related to re-coating preparation, including membrane roofing system manufacturer's written instructions. iii. Review temporary protection requirements for existing roofing system that is to remain, during and after installation. iv. Review roof drainage during each stage of re-coating and review roof drain plugging and plug removal procedures. v. Review and finalize construction schedule, and verify availability of materials, Installer's personnel, equipment, and facilities needed to make progress and avoid delays. vi. Review base flashings, special roofing details, drainage, penetrations, equipment curbs, and condition of other construction that will affect re-coating. vii. Review HVAC shutdown and sealing of air intakes. viii. Review existing conditions that may require notification of Owner before proceeding

Post-Bid

Municipal

$400,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
228
Active Projects
103
Bidding Soon
2,353
All Active Projects
1,106
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 31, 2021

September 30, 2021

img_map_placeholder

505 City Pkwy W, Orange, CA


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.