EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 16, 2021 at 7:00 PM

Updated March 22, 2025

Site work and paving for a civil project in Petal, Mississippi. Completed plans call for site work for a pipeline; road / highway; and for paving for a road / highway.

Supplying all labor and materials (as specified) necessary for construction of the Initial Installation of a Landfill Gas Collection and Control System (GCCS). The work generally consists of the following: 1. Blower/flareskid access road and site pad construction 2. Mechanical and electrical installation of an owner-supplied blower/flareskid. 3. Approximately 1,836 lf of extraction well drilling. 4. Installation of 6 condensate sumps 5. Installation of piping and fittings required for LFG, air, and condensate/leachate forcemain lines. Project No. 16091.002 The above general outline of features of the work does not in any way limit the responsibility of the Contractor to perform all work and furnish all plant, labor, equipment and materials required by the specifications and the drawings referred to therein. Contract time shall be 90 consecutive calendar days from the effective date shown in the Notice to Proceed. Liquidated damages will be assessed in the amount of $1,500 for each consecutive calendar day the Work has not achieved Final Completion. Special Damages: In addition to the amounts provided for liquidated damages, expenses and other losses, Contractor, in the event of such default, shall pay to the Owner the actual costs, expenses and other losses reasonably incurred by Owner. Bidder must be qualified under Mississippi Law and show current Certificate of Responsibility issued by the Mississippi State Board of Public Contractors establishing his classification as to the value and type of construction on which he is authorized to bid. Sealed Bid Initial Installation of GCCS Pine Belt Regional Solid Waste Management Authority Each Bidder shall write his Certificate of Responsibility Number on the outside of the sealed envelope containing his proposal. Each Bid must be received in a sealed envelope which is marked in the lower left-hand corner Exactly. The Contractor is fully responsible for the timely delivery of sealed bids to the Pine Belt Regional Solid Waste Management Authority regardless of the method he chooses for delivery. Each Bidder must deposit with his proposal, a Bid Bond or Certified Check in an amount equal to five percent of his bid, payable to the Pine Belt Regional Solid Waste Management Authority, as bid security. Bidders shall also submit a current financial statement, if requested, by the Pine Belt Regional Solid Waste Management Authority. The successful bidder will be required to furnish a Payment Bond and Performance Bond each in the amount of 100 percent of the contract amount. The Pine Belt Regional Solid Waste Management Authority reserves the right to reject any and all bids and to waive any informalities or irregularities therein. Proposals shall be submitted in duplicate, sealed and deposited with the Pine Belt Regional Solid Waste Management Authority prior to the hour and date hereinbefore designated. No bidder may withdraw his bid within 90 days after the actual date of the opening thereof. Each Bidder must submit with his proposal a separate attachment stating his qualifications to perform the work. The Statement of Qualifications shall list past projects of similar size and nature, a list of references with name and telephone number, a list of key personnel who will perform the work, and other information supporting the bidders qualifications. Awarding public contracts to non-resident Bidders will be on the same basis as the non-resident bidders state awards contracts to Mississippi Contractors bidding under similar circumstances. In order to ensure that Mississippis so-called Golden Rule is followed state law requires a non-resident bidder to attach to his bid a copy of his resident states current laws pertaining to such states treatment of non-resident contractors. Bids may also be submitted electronically. Plan holders are required to log-in or register for an account electronically to view and order Bid Documents. All plan holders are required to have a valid email address for registration. Prospective bidders must be registered on the online plan holder list in order to submit a bid. Questions regarding registration and electronic orders should be directed to our web support line at (662) 407-0193. The Engineers are Neel-Schaffer, Inc. [328 N. Magnolia Street, Laurel, Mississippi 39440, (601) 649-1840, Fax No. (601) 649-1848] and Franklin Engineers and Consultants, LLC. [2734 Sunrise Boulevard, Suite 308, Pearland, TX 77584, (281) 205-8415, Fax No. (281) 205-8420]. The Pine Belt Regional Solid Waste Management Authority hereby notifies all Bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement, disadvantaged and womens business enterprises will be afforded the full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. RFI by signing in the space provided below and return this page via email by 12:00 PM CST on Tuesday December 14, 2021 to jfranklin@franklinengineers.com

Post-Bid

Pipeline

$100,000.00

Public - County

Paving, Site Work

19

14

50

6

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Control, Testing Laboratory Services, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Temporary Construction, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing
Division 08 - Openings

Division 08 - Openings

Hardware
Division 12 - Furnishings

Division 12 - Furnishings

Casework
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment

Find More Local Projects

Within 75 Miles of This Project
76
Active Projects
30
Bidding Soon
470
All Active Projects
195
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 20, 2021

January 19, 2022

img_map_placeholder

5274 MS-29, Petal, MS

Related To This Project


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Initial Installation of a Landfill Gas Collection and Control System

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.