BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 23, 2021 at 8:00 PM

Updated April 4, 2025

Site work and paving for a road / highway in San Mateo, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of 9/22/2021 project was already awarded for $1,015,002.55. Proposers shall purchase a complete set of plans and specifications and provide contact information through Barker Blue in order to be eligible to bid on this project. The Contract Book, plans and proposal forms are available at City of San Mateo - Public Works Bidding Web Portal. Contractors can also email Barker Blue's Customer Support Team at plans@barkerblue.com or call 650-696-2100 for assistance. Any questions regarding the contract documents should be directed to Stephanie Gindlesperger, Senior Engineer at (650) 522-7300, or in writing at publicworks@cityofsanmateo.org. The estimated construction cost of this project is $1.6 Million. This estimate is not based on a "contractor's cost take off" of the project, but is derived from an averaging of costs for work on similar projects in the area of which the City is aware. This figure is given to indicate the relative order of magnitude of this project and is not intended to influence or affect in any way the amount bid for this project. All bids shall be accompanied by a bid bond, cashier's check, or certified check made payable to the City of San Mateo in an amount not less than ten percent (10%) of the aggregate amount of the bid. Said amount or the proceeds of said bond shall be forfeited to the City if the bidder depositing same does not, within 8 working days after the bidder has received notice from the City of San Mateo that the contract has been awarded, sign and return the contract to the City and furnish the other items required under Section 3, "Contract Award and Execution," of the special provisions The Payment Bond and the Performance Bond shall be in a sum equal to the contract price. If the Performance Bond provides for a one-year warranty a separate Maintenance Bond is not necessary. If the warranty period specified in the contract is for longer than one year a Maintenance Bond equal to 10% of the contract price is required. Bonds shall be duly executed by a responsible corporate surety, authorized to issue such bonds in the State of California and secured through an authorized agent with an office in California. CONTRACT TIME: 55 Working Days

Award

Roads / Highways

$1,015,003.00

Public - City

Paving, Site Work

19

6

4

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
488
Active Projects
205
Bidding Soon
2,884
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 19, 2021

November 1, 2021

Project location map

Multiple Locations, San Mateo, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.