BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Folsom, California. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The City of Folsom (City) is seeking an experienced Consultant Team to prepare a Feasibility Study Report (FSR) for the implementation of the Folsom Boulevard Class I Overcrossing. The objective of the FSR is to consider possible alternatives for establishing an east-west gap closure across Folsom Boulevard and the feasibility for its implementation. The City is currently considering a Class I multi-use overcrossing at an undetermined location between Blue Ravine Road and Glenn Drive. The connection must be safe, convenient, and cost-effective. The overcrossing alternatives will be presented to the general public, property owners, and potential stakeholders in a series of public meetings, as part of the selected consultant's responsibilities, to identify a community preferred alternative. Upon successful selection, the preferred alternative will be used as the basis for grant funding requests and will serve as the project description for the preliminary engineering (PE) phase, neither of which are included in this agreement. Overcrossing alternatives should consider various construction types suited to the conditions. The structure footprint should generally remain outside of the existing Sacramento Regional Transit (SacRT) right-of-way. Architectural, cultural, and environmental components should reflect the City's and surrounding area character and will be further developed through the community outreach process. An undercrossing was determined to be infeasible at an earlier stage of this project and as such will not be considered for this feasibility analysis. The FSR for the Folsom Boulevard Overcrossing would evaluate locations for the span to cross over Folsom Boulevard south of Glenn Drive and north of Blue Ravine Road, connecting the Folsom Parkway Rail Trail east of Folsom Boulevard and the Humbug- Willow Creek Trail (HBWC) to the American River Parkway Trail (ARPT) west of Folsom Boulevard (see Attachment A). Once developed as part of the FSR, the overcrossing location alternatives will be presented to the general public, property owners, and potential stakeholders in a series of public meetings to identify a community preferred alternative. Upon successful selection, the preferred alternative will be used as the basis for future grant funding requests and will serve as the project description. Questions regarding this RFP may be addressed to: Brett Bollinger Senior Trails Planner bbollinger@folsom.ca.us (916) 461-6632 The method of contractor selection has not been determined at this time.

Conceptual

Roads / Highways

$8,000,000.00

Public - City

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
304
Active Projects
151
Bidding Soon
2,612
All Active Projects
1,060
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.