BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 1, 2021 at 8:00 PM

Updated January 26, 2024

Renovation of a mixed-use development in Salem, Massachusetts. Completed plans call for the renovation of a educational facility.

Collins Middle School Office Renovations Attention is directed to the minimum wage rates to be paid to applicable bids as determined by the Department of Labor Standards under the provisions of Massachusetts General laws, Chapter 149, Sections 26 to 27D inclusive. The awards are made by the Purchasing Agent and are subject to Mayoral approval. The City of Salem reserves the right to reject all bids/all proposals or to waive any informality in the IFB/RFQ process, if deemed in the City's best interest. Thomas P. Watkins Purchasing Agent The Contractor shall start the work under this Contract on written notice on or around September 20, 2021; completion no later than November 30, 2021. 1. Demolition and removal of portions of interior partitions, as indicated. 2. Demolition and removal of doors, frames and associated hardware, as indicated. 3. Demolition and removal of all toilet partitions and accessories. 4. Demolition and removal of ceramic tile wall finish. 5. Demolition and removal of plumbing fixtures. 6. Demolition and removal of light fixtures, as indicated. 7. Removal and salvage of the following for reinstallation: Detach items from existing construction and legally dispose of them off-site, unless indicated to be removed and salvaged or removed and reinstalled. Protect walls, ceilings, floors, and other existing finish work that are to remain or that are exposed during selective demolition operations. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. 1. Acoustical ceiling panels 2. Exposed grid suspension system 3. Wire hangers, fasteners, main runners, cross tees, and wall angle moldings 4. Perimeter TrimAction nstall wall moldings at intersection of suspended ceiling and vertical surfaces. Miter corners where wall moldings intersect or install corner caps. Concrete floors must be free of dust, solvent, paint, wax, oil, grease, residual adhesive, adhesive removers, film-forming curing compounds, silicate penetrating curing compounds, sealing, hardening or parting compounds, alkaline salts, excessive carbonation or laitence, mold, mildew, and other foreign materials that may affect dissipation rate of moisture from the concrete, discoloration or adhesive bonding.

Post-Bid

Educational

$375,000.00

Public - City

Renovation

23

12

14

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
604
Active Projects
299
Bidding Soon
3,405
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 10, 2021

September 20, 2021

Project location map

29 Highland Ave, Salem, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.