BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Ontario, California. Completed plans call for site work for a water / sewer project.

Site address is 2662 E. Walnut Street, Ontario, CA 91761. As of February 2, 2022, this project is bidding to prequalified general contractors. PLEASE NOTE: SCW Contracting Corporation is seeking qualified DBEs, MBEs, WBEs, SBEs, SBA MBEs, HUBZone, DVBEs, SBRA, LSAF, HUB. IEUA is seeking to prequalify construction contractors that are qualified to construct the RP-1 Disinfection Project No. EN11039. The project is expected to be bid for construction in the October 2021 timeframe, with expected construction contract award by December 2021. The contractor shall fully review the project and timeline and note how construction completion can be met, prior to submitting a prequalification package. This should be summarized in their project management approach narrative. The contractor shall also submit a P6 schedule of a similar job as part of the contractors prequalification package. The demolition of the existing sodium hypochlorite storage and metering facility, construction of a new sodium hypochlorite storage and metering facility, construction of chemical dosing facilities, improvements to the existing sodium bisulfite storage and metering facility, structural and mechanical repairs to the existing sedimentation basin, improvements to provide an out-of-compliance diversion to Lagoon No. 3 and reconstruction of existing improvements affected by the Work, and incidentals for complete a usable facility. IEUA is seeking to prequalify construction contractors that are qualified to construct the RP-1 Disinfection Project No. EN11039. The project is expected to be bid for construction in the October 2021 timeframe, with expected construction contract award by December 2021. The contractor shall fully review the project and timeline and note how construction completion can be met, prior to submitting a prequalification package. This should be summarized in their project management approach narrative. The contractor shall also submit a P6 schedule of a similar job as part of the contractors' prequalification package. The Work consists of all materials, labor, tools, equipment, apparatus, facilities, transportation and incidentals necessary to furnish, deliver and install the RP-1 Disinfection Improvements Project, including the demolition of the existing sodium hypochlorite storage and metering facility, construction of a new sodium hypochlorite storage and metering facility, construction of chemical dosing facilities, improvements to the existing sodium bisulfite storage and metering facility, structural and mechanical repairs to the existing sedimentation basin, and, repair and reconstruction of existing improvements affected by the Work, and incidentals for complete and usable facility. The work includes: 1. Asphalt improvements and new parking lot. 2. The existing 10,000-gallon polyethylene storage tanks and metering pumps shall be demolished from the existing storage location south of Lagoon No. 3. 3. A new sodium hypochlorite storage and metering facility shall be constructed including a new containment structure with canopy, new polyethylene storage tanks, and new peristaltic chemical metering pumps. 4. Improvements to the Old Effluent Structure (OES) and New Effluent Structure (NES) will be constructed to provide a pump mix chemical injection system. The improvements will include the construction of an open pit pump station and associated piping at both the OES and NES. 5. Improvements to the existing sodium bisulfite storage and metering facility will be made to include a power outage response. The improvements include the addition of piping and a fail-open pneumatic valve. 6. Repairs and improvements shall be made to the existing sedimentation basin. The repairs include the replacement of concrete joint sealant, replacement of grout, concrete crack repair, recoating structural steel and piping, and repair and replacement of the sedimentation basin bridge pumps.

Post-Bid

Water / Sewer

$5,100,000.00

Public - City

Site Work

Subscribe For Documents

69 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
206
Active Projects
103
Bidding Soon
2,248
All Active Projects
1,014
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.