BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in El Cajon, California. Conceptual plans call for site work for a water / sewer project.

As of December 20, 2021, an engineer has been selected for the project. Bidding is estimated to take place in August of 2022. *The closed solicitation has been included below for reference: Padre Dam Municipal Water District (District) is requesting proposals from qualified professional engineering consultants to design the Interstate-8 (I-8) Unencased Pipeline Crossings Replacement (Project). The design phase for the Project is part of the District's Capital Improvement Program (CIP) for Fiscal Years 2018- 2022 that sufficiently funds the maintenance and replacement of aging infrastructure and facilities ensuring safe, reliable, and long-term operation of the water and sewer systems. The District anticipates the construction phase will be fully funded in the subsequent CIP. The primary goal of the Project is to reduce the District's risk exposure from water main breaks within Caltrans right-of-way and to ensure reliable potable water service is continually maintained. The primary potable water transmission system for the Eastern Service Area, sometimes referred to as the "Backbone" system, consists of steel pipeline ranging in diameter from 16-inch to 33-inch. The system was installed in the early 1960's prior to the construction of the I-8 Freeway. Around 1969, I-8 was constructed and the existing Interstate crosses over the existing steel pipeline in two locations. Records indicate that no casing was installed around the pipelines when I-8 was constructed. Although the District has adequately operated and maintained the "Backbone" system over the years, the District is concerned about the Interstate crossings. First, the layout creates significant impact on the ability for the District to access, inspect, and repair these portions of the transmission main. Second, the transmission system was not constructed to today's freeway crossing standards typically governed by Caltrans. Third, the aging of the transmission main increases the risk of leaks and failures. A significant pipe leak under I-8 with limited or no access to conduct repair or construction work would pose a number of significant problems including increased time for repair, increased shutdown time to residents and businesses, potential damage to the freeway, and traffic impacts/disruptions. Therefore, the goal of this Project is to address these concerns with long term permanent solutions. By engaging an engineering consultant to develop design plans and technical specifications for use during construction, the District could reduce the liabilities for water outages and damages in the area. Any questions proposing consultants may have shall be directed in writing to Wilson Lau at wlau@padre.org. All inquiries shall be received by August 11, 2021. The method of contractor selection has not been determined at this time.

Conceptual

Water / Sewer

$2,000,000.00

Public - County

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
30
Bidding Soon
843
All Active Projects
371
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 1, 2022

img_map_placeholder

I-8, El Cajon, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.