Find the next project before your competition does.

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 21, 2021 at 7:00 PM

Updated November 14, 2023

Site work and new construction of a transportation facility in North Charleston, South Carolina. Completed plans call for the construction of a transportation facility; and for site work for a transportation facility.

Charleston Area Regional Transportation Authority (CARTA) is seeking proposals from qualified and licensed design-build firms to prepare detailed plans and specification and the construction of electric bus charging infrastructure at CARTA, located at 3664 Leeds Ave. North Charleston, SC 29405. The base scope of work will include but it not limited to the following items: o Provide a Master Construction Schedule. o Provide Construction Management Services o Provide Engineering Design sufficient for permitting with progress reviews at CD30, CD60 and C D90. o Perform Arc Flash/Short Circuit Coordination analysis and provide labels on electrical equipment o Submit to and obtain permit from the local authority having jurisdiction (AHJ). o Permit Fees. o Coordination with Proterra and local utility provider. o Coordination with AHJ inspector. o Supply and install conduit for the primary feeder to the service transformer. o Provide concrete pad for new service transformer per Dominion specs. o Provide concrete pads for utility feed through cabinets per Dominion Energy specs. o Provide and Install primary conduits from utility service demarcation point (along Leeds Ave.) to each feed-thru cabinet and to primary side of the transformer per Dominion specs. o Supply and Install conduit and wire on the secondary side of the service transformer to new Switchboard. o Supply and Install concrete equipment pad for new charger and Switchboard. o Supply new Switchboard sized per NEC requirements. o Install new switchboard on concrete equipment pad. o Supply and Install conduit and wire from new Switchboard to new 1.2MW Chargers. o Install new chargers on concrete equipment pad per specs provided. o Supply and Install conduit and wire from new charger to remote dispensers per specs provided. o Install Remote Dispensers on concrete pads per specs provided. o Provide any trenching/boring, backfill and restore in kind that may be needed to facilitate the work. o Provide clean As-Builts in pdf/AutoCAD formats. As part of the system design, the vendor will be required to utilize in-place communications infrastructure at bus stops and shelters for transmitting real-time transit information to digital displays from the central software required for digital display management.

Post-Bid

Transportation Terminals

$140,000.00

Public - State/Provincial

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
154
Active Projects
51
Bidding Soon
912
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 24, 2021

December 8, 2021

Project location map

3664 Leeds Ave, North Charleston, SC

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed