BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a detention facility in Leesburg, Virginia. Completed plans call for the renovation of a detention facility.

The Intent of this Invitation for Bid (IFB) is for the County of Loudoun, Virginia (County) to obtain the services of a qualified General Contractor for the Loudoun County Adult Detention Center Heating, Ventilation and Air Conditioning (HVAC) Improvements Project. This Project consists of improvements to the HVAC system at the Loudoun County Adult Detention Center located at 42035 Loudoun Center Place, Leesburg, Virginia 20177. The HVAC improvements consist of the replacement of two existing air-cooled chillers located at grade. The new chillers shall be installed on the existing concrete pads with manufacturer-provided support rail curbs and reconnection to the existing chilled water system distribution piping and electrical connections. The existing distribution pumps and Variable Frequency Drives will also be replaced. A new glycol feed tank system shall be provided for the chilled water distribution system and the chilled water loop shall be filled with a thirty-percent (30%) propylene glycol solution. The equipment start-up and testing shall be performed by the factory authorized service agency. All exterior chilled water piping insulation shall be removed and replaced. All exterior piping shall be heat traced. New control sensors and devices shall be provided for the new. Substantial Completion / Certificate of Occupancy 90 Calendar Days after Notice to Proceed Completion of all punch list work 30 Days after Substantial Completion Project Timeline. The Contract Time is ninety (90) calendar days from Notice to Proceed to Substantial Completion. Notice to Proceed (NTP) will not be given until all materials and equipment, are delivered and inspected by the County or their representative. All material and equipment submittals required by the specifications shall be submitted to the County no later than thirty (30) calendar days from the date of contract execution and approved by the County no later than sixty (60) calendar days from the date of contract execution. Substantial Completion of work shall not be given until after the HVAC system has been function tested. The Contractor shall achieve Substantial Completion, as defined in the General Conditions no later than 180 calendar days after the date of the Notice to Proceed. This time period shall be designated as the Time for Completion.

Award

Jails / Prisons

$602,307.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
172
Active Projects
81
Bidding Soon
1,966
All Active Projects
753
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 31, 2021

September 30, 2021

img_map_placeholder

42035 Loudoun Center Pl, Leesburg, VA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.