BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 22, 2022 at 8:00 PM

Updated January 26, 2024

Site work for a bridge / tunnel in Vail, Colorado. Completed plans call for site work for a bridge / tunnel.

As of February 23, 2022, project was not yet awarded. it is expected to be awarded on March 1, 2022. The project generally consists of the rehabilitation of an existing pedestrian bridge in Ford Park over Gore Creek. Work includes replacement of the timber deck with a concrete corrugated metal deck and replacement of the timber bridge railing with a similar railing. Bidders are required to select one of the two alternate construction schedules for the project and note the selection on the Bid Form. All work shall be completed within the bidder selected construction schedule. The general timeline for the work is as follows: Notice of Award March 2, 2022 Notice to Proceed March 16, 2022 Bid security in the amount of five percent (5%) of the total Bid must accompany each Bid.No Bid may be withdrawn within a period of thirty (30) days after Bid opening.The Owner reserves the right to reject any and all Bids, to waive informalities, and to reject nonconforming, nonresponsive, or conditional Bids.

Award

Bridges / Tunnels

$108,000.00

Public - City

Site Work

9

5

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
136
Active Projects
58
Bidding Soon
659
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.