Renovation of a mixed-use development in Memphis, Tennessee. Completed plans call for the renovation of a educational facility.
As of January 11, 2022, this project has not been awarded yet. A firm construction timeline has not been established. All questions or requests for clarification of technical issues and terms pertaining to this Bid must be emailed to William Webb, webbw@scsk12.org and LaJuanna JonesSulton, jonessultonlm@scsk12.org by 10:00AM/CST on August 13, 2021. Questions must specifically reference the section of the Bid to which the question pertains. In order to prevent an unfair advantage to any respondent, all questions and answers will be posted as an addendum on Procurements website on August 19, 2021 by 4:00PM. The following is a summary Supplemental Scope of Work for the design and construction of HVAC System Replacements at several locations. The Supplemental Scope of Work includes but is not limited to the following: 1. Design and construction services shall be per the "Design/ Planning Principles & Construction Guidelines for Shelby County Schools", latest edition. 2. A design & construction baseline schedule shall be provided for approval and acceptance prior to the commencement of any design and construction work. 3. Design and Construction services will be required to utilize SCS Department of Major Construction's construction management platform, PROCORE. This access and training will be at no cost to the vendor. 4. The Engineer-of-Record (EOR) shall design the new equipment to provide an energy efficient, sustainable, long life cycle, and low maintenance system related to the existing building envelope. EOR shall not engage a 3rd-party vendor such as a supplier or manufacturer unless written approval has been received from the SCS Director of Construction. 5. Design services shall include but not be limited to demolition, structural, architectural, mechanical, electrical, plumbing, fire protection, life safety, EMS, and site utility. 6. Designer/ Builder shall confirm and verify existing conditions compared to provided as-built documents to ensure required clearances and pathways are available. 7. Design shall meet all current and applicable local, state, and federal codes as adopted and enforced by the AHJs. 8. Designer/ Builder shall confirm and verify that existing HVAC system foundations will support new replacement equipment loads, i.e. cooling tower/ chiller foundations. If not, designer shall provide new design for review and approval. 9. Additional design services expenses, typically referred to as reimbursable fees, shall include those costs related to AHJ applications for reviews and approvals, permit applications, permit fees, and reproduction costs. 10. The construction document estimate shall be submitted for SCS approval prior to construction commencement. 11. All project documents such as construction drawings and the project manual must be reviewed and approved by the SCS Department of Major Construction prior to the submission for any AHJ approvals or permits. It is recommended to provide a signature block on the project documents for SCS signatory approvals. SCS signatory template available upon request. 12. Construction services shall include all equipment, material, and labor for the successful completion of the project per the accepted and approved project drawings and specifications. 13. Contractor shall provide SCS (Owner) opportunity to salvage HVAC equipment as necessary. 14. HVAC systems additional appurtenances/ accessories shall include but not be limited to the following: a. Cabinet extensions to conceal piping or trim accessories necessary to maintain aesthetics. b. Drain pans, piping, condensate pumps (if required), valves, actuators, etc. c. Bipolar ionizers that are salvaged for reinstallation. d. Cottonwood filters e. New fall protection/ guard rails as required for existing roof mounted equipment within 10'-0" of roof edge. See Shelby County Uniform Development Code and current adopted building code for specifics. Installation shall not impact roof system performance. f. Chemical treatment systems g. Bypass feeder with cartridge filter h. Air/ dirt separator with blow down i. Pressure reducing valves j. New appropriately sized utilities required to serve new equipment such as gas piping, electrical wiring, water supply lines, etc. 15. SCS recommends and prefers condensing boilers, high mass or low mass, as the project requirements dictate or allow. 16. An Owner's Contingency WILL NOT be included in the overall construction cost. It is recommended that the contractor include costs for unforeseen conditions that may arise specific to a project's scope and location. 17. A 12-month warranty for parts and labor is required 18. Project Alternates shall include the following items: a. Energy Management System (EMS) or Building Automation System (BAS)- See the district's approved/preferred vendors list in the Design/Planning Principles & Construction Guidelines For Shelby County Schools manual located on p.62. An approved equal shall be considered with appropriate support documentation and justification. b. MLGW Fees- New or modified services for modified equipment loads, etc. c. Fire Alarm System- shall meet current code i. Existing Fire Alarm Panel Replacement- Applicable if current fire alarm panel does not have capacity for any new devices such as required duct detectors. Contractor to confirm. d. HVAC Commissioning- 3rd Party Bid Results Bid Lot 3A.1 - Martin & White Mechanical Contractors, Inc - $40,526,032.00 Bid Lot 3A.2: - CS3, Inc. - $12,075,000.00 Bid Lot 3A.3 - Martin & White Mechanical Contractors, Inc - $5,174,686.00 Bid Lot 3A.4: - Damon - Marcus Company - $9,465,406.00
Bid Results
Educational
$67,241,124.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 2, 2021
January 3, 2022
Multiple Locations, Memphis, TN
Related To This Project
Memphis, TN
Bid Date: Aug 18 2021
Memphis, TN
Bid Date: Aug 16 2021
Memphis, TN
Bid Date: Jan 05 2022
Memphis, TN
Bid Date: Jan 05 2022
Memphis, TN
Bid Date: Jan 06 2022
Memphis, TN
Bid Date: Dec 17 2021
Memphis, TN
Bid Date: Jan 05 2022
Memphis, TN
Bid Date: Jan 05 2022
Memphis, TN
Bid Date: Jan 12 2022
Memphis, TN
Bid Date: Jan 12 2022
Memphis, TN
Bid Date: Dec 02 2021
Memphis, TN
Bid Date: Dec 08 2021
Memphis, TN
Bid Date: Dec 15 2021
Memphis, TN
Bid Date: Sep 20 2023
Memphis, TN
Bid Date: Sep 27 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Try it free. The data you need to build the relationships you want.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.