Published June 28, 2023 at 8:00 PM

Updated October 1, 2024

Renovation of a mixed-use development in Pittsburgh, Pennsylvania. Completed plans call for the renovation of a parking garage; and transportation facility.

Attention is called to the fact that not less than the minimum salaries and wages, as determined by the Pennsylvania Department of Labor and Industry, must be paid on these projects. Proposals must be made on the Authority's form and in accordance with the Plans and Specifications and the "Instructions to Bidders"'. This project has DBE participation goals; DBE firms must be certified with the Pennsylvania Unified Certification Program) (PA UCP). Firms must be certified prior to award of contract. For additional information call the Engineering Contracts Department at 412-472-3677, 412-472-3543, or the Project Manager at 412-472-5647. The Airport Authority reserves the right to reject any and all bids or waive any informalities in the bidding. No bidder may withdraw his bid for a period of sixty [60] days after the scheduled closing time for receipt of bids. All prospective bidders are required to execute the Bid Schedule, Bid Bond, Proposal, NonCollusion Affidavit, Non-Segregated Facilities Form, Status of Contracts on Hand, the Letter of Assent, adhering to the Allegheny County Project Stabilization Agreement, Bidder's Understanding of Conditions Applicable to Proposal, EEOC Compliance Form, NonDiscrimination Certification, Lobbying Certification Form, Contractor's Experience Questionnaire, the DBE Certification form and documentation, and Public Works Employment Verification Form, which are all included within the proposal of each respective project; otherwise, the bid could be rejected. (REV 0 2-24-14)-2014(2019)

Post-Bid

Transportation Terminals

$450,000.00

Public - County

Renovation

25

15

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Assurance, Manufacturer Qualifications, Quality Control, Contractor Quality Control, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties
Division 03 - Concrete

Division 03 - Concrete

Concrete, Maintenance of Concrete, Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Finish Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Traffic Coatings, Fire and Smoke Protection, Applied Fireproofing
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Hardware, Door Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Other Specialties, Scales
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Loading Dock Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Chairs
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Escalators and Moving Walks
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Pumps, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings, Air Outlets and Inlets, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Low-Voltage Switchgear, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Lighting, Emergency Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Storage Tanks
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Manufacturing Equipment, Assembly and Testing Equipment, Applicators
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
200
Active Projects
140
Bidding Soon
1,211
All Active Projects
569
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 12, 2023

August 11, 2023

img_map_placeholder

1000 Airport Blvd, Pittsburgh, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Short-Term Parking Garage Rehabilitation

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.