Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 3, 2021 at 8:00 PM

Updated November 14, 2023

Renovation of a municipal facility in Framingham, Massachusetts. Completed plans call for the renovation of a 71,000-square-foot, four-story above grade municipal facility.

This project is a new 4-story academic building containing approximately 71,000 SF of administration space, offices, classrooms, simulation rooms, student services and lounges, a cafe, toilet rooms, mechanical rooms, loading, and a parking field. The CM at Risk Firm is Lee Kennedy Co., Inc. Request for Qualifications for Trade Contractors Masonry; Miscellaneous & Ornamental Iron; Waterproofing, Dampproofing & Caulking; Roofing & Flashing; Glass & Glazing; Tile; Acoustical Tile; Resilient Floors; Painting; Fire Protection Sprinkler System; Plumbing; HVAC; Electrical This Request for Qualifications ("RFQ") is the first phase of a two-phase procurement process as set forth in MGL Chapter 149A. DCAMM, through its Trade Contractor Prequalification Committee is prequalifying firms interested in providing public Trade Contractor services on this Public Construction Manager at Risk ("CM at Risk") Project for the construction of Mass. Bay Community College - Framingham - Health Science Center, Framingham, MA, through this RFQ process. Request for Qualifications for Thirteen (13) Trade Contractor packages: Masonry ($1,895,115); Miscellaneous & Ornamental Iron ($399,092); Waterproofing, Dampproofing & Caulking ($278,391); Roofing & Flashing ($720,019); Glass & Glazing ($68,958); Tile ($94,610); Acoustical Tile ($496,972); Resilient Floors ($389,640); Painting ($206,217); Fire Protection Sprinkler System ($436,138); Plumbing ($827,795); HVAC ($6,833,369); Electrical ($3,766,629), for Mass. Bay Community College - Health Science Center, Framingham, MA. Estimated Total Project Duration: 700 Days

Post-Bid

Municipal

$40,000,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
870
Active Projects
436
Bidding Soon
5,861
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 12, 2021

October 11, 2021

Project location map

19 Flagg Dr, Framingham, MA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed