Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 15, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Billings, Montana. Completed plans call for site work for a fire / police facility; and sidewalk / parking lot.

The project consists of: Excavating 5,021 cubic yards of material and placing in HESCO barriers, installing 4,799 square yards geogrid and 9,167 square yards of non-woven geotextile, installing 3,250 cubic yards of crushed base course, installing 867 lineal feet of storm drain and culvert pipe, vegetative restoration, and 1,016 square feet of concrete sidewalk. The Work shall be substantially complete within 40 working days after the date when the Contract Time commences to run as provided in paragraph 2.03 of the General Conditions. Final completion ofthe Work shall be within 15working days afterthe date of Substantial Completion.

Award

Fire / Police

$574,048.00

Public - City

Paving, Site Work

18

19

15

5

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
9
Bidding Soon
120
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed