BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and new construction of a water / sewer project in San Francisco, California. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

Subject to conditions prescribed by the City and County of San Francisco, CA responses to this bid request are sought from suppliers to furnish and install Elevators. The intent of this project is to replace the existing Headworks Facility at the SE Water Pollution Control Plant with a new all-weather 250 MGD Headworks Facility. This is solicitation 10 for Scope III New Headworks Construction. The scopes being sought for this project are as follows: 3-19 Structural Steel - 20% LBE Requirement 3-29 Glass and Glazing - 0% LBE Requirement 3-30 Paints and Coatings - 20% LBE Requirement 3-40 Overhead Crane Procurement - 0% LBE Requirement 3-64 Hydraulic Power System Procurement - 0% LBE Requirement 3-73 Fiber Wall Reinforcement - 0% LBE Requirement 3-74 Trough Belt Conveyor System Procurement - 0% LBE Requirement 3-75 Self-Contained Compactor Procurement - 0% LBE Requirement 3-76 Submersible Centrifugal Pumps Procurement - 0% LBE Requirement 3-78 Mechanical Course Screens Procurement - 0% LBE Requirement Pre-qualification of Prospective Subcontractors: The Owner has determined that subcontractors who submit bids to Sundt/Walsh on this Project must be pre-qualified. Those subcontractors who pre-qualify will be allowed to bid on the above Scope of Work. Questions should be sent to David Cooley, Precon Project Manager via email at dcooley@Sundt.com. Bidders are not to contact the Owner, Architect, or Engineers directly. All questions, clarifications, or coordination issues must be in writing and reference the appropriate detail(s) and/or the specification section and paragraph, no later than seven (7) calendar days before the bid date *The Value reflects that of the overall project and not these specific trades.

Post-Bid

Water / Sewer

$26,000,000.00

Public - County

New Construction, Site Work

3080

183

1420

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
155
Active Projects
81
Bidding Soon
1,807
All Active Projects
749
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 10, 2021

November 9, 2021

img_map_placeholder

750 Phelps St, San Francisco, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.