BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work and renovation of an educational facility in Kirkwood, Missouri. Completed plans call for the renovation of a educational facility; and for site work for a educational facility.

Estimated construction cost is $125,000. For North Glendale and Robinson Elementary School - ADA Ramp Installations This project requires the Contractor to a new exterior ADA ramp at both North Glendale Elementary School and Robinson Elementary School. Contractor shall furnish all materials, tools, equipment and labor necessary to perform the scope in accordance with the requirements, recommendations and specifications of this document. Award of the bid will be based on lowest and best qualified bid at the owner discretion All bids equal to or greater than $5,000 must be accompanied by a Bidder Bond executed by the Bidder as Principal and by a Surety Company authorized to do business in Missouri as the Surety; or a company check in a sum equal to five percent (5%) of the total amount of the Bid. Each Bidder who submits a bid shall hold any licenses as required by law. No bids will be read or considered which do not fully comply with the above provisions as to bond and licenses, and any deficient bid submitted will be resealed and returned to the Bidder immediately The Owner reserves the right to conduct additional pre-bid meetings, if necessary, to fulfill the bidding requirements of the Board of Education and State of Missouri for competitive bidding. In addition, the Owner reserves the right to hold all bids for a period of sixty (60) days after the date fixed for the openings of bids, to reject any and all Bids and waive any formalities or irregularities. The Contractor will be allowed to start on-site work no earlier than August 31, 2021 and the work must be completed no later than October 29 ,2021. Work can be performed during normal hours as determined by the Authority Having Jurisdiction; however, the Contractor cannot perform work activity which will disrupt operation of the schools. Bid Results: Work Group #1:N Glendale ES Bombshell Construction Services-$180,000 Work Group #2: Robinson ES Bombshell Construction Services-$ 100,000

Award

Educational

$280,000.00

Public - City

Renovation, Site Work

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
53
Bidding Soon
794
All Active Projects
287
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 19, 2021

September 1, 2021

img_map_placeholder

Multiple Locations, Kirkwood, MO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.