BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and new construction of a bridge / tunnel in Alameda, California. Conceptual plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The City, in partnership with the City of Oakland, is advancing the implementation of a bicycle and pedestrian bridge to create high quality multi-modal access between Oakland's Jack London Square area and west Alameda. This project is the long-term crossing option identified in the 2009 Estuary Crossing Study. Currently, the only bicycle and pedestrian access is inside the Posey Tube, on a narrow three-foot wide walkway. Only approximately 100 people brave this crossing each day. A new bicycle and pedestrian bridge will provide a safe and convenient sustainable travel option between commercial districts, the downtown Oakland employment center, the many residents in both cities, and to and from the BART stations that connect people to the rest of the Bay Area region. This project will develop the Project Initiation Document (PID) in collaboration with the Alameda CTC. The PID will allow the bridge to become a fundable project by further defining potential build alternatives and landing locations on both sides of the estuary, preparing detailed cost estimates, outlining environmental and permitting requirements, exploring potential ownership and maintenance of the bridge, plus identifying any other major elements that should be investigated. Project is included in the City of Alameda's FY 2022-2023 CIP. Per the owner, as of June 10, 2024, they are in the very early planning stage. The owner states that design will not start for another four to five years and construction will not start for another eight years in a best case scenario. The owner states that these phases are not currently funded. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Bridges / Tunnels

$1,555,000.00

Public - City

New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
87
Bidding Soon
1,905
All Active Projects
781
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2032

img_map_placeholder

To Be Determined, Alameda, CA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.