BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a municipal facility in Avon, Colorado. Conceptual plans call for the construction of a municipal facility; and for site work for a municipal facility.

As of February 23, 2022, this project is in the conceptual phase. An architect has not been selected. Although a firm timeline for construction has not been determined, construction is not expected to start prior to August 2022. *The closed solicitation has been included below for reference: https://www.vaildaily.com/news/eagle-valley/avon-town-council-to-review-concept-plans-for-new-community-housing-project/ Avon Town Council to review concept plans for new community housing project The Swift Gulch housing development could bring over 40 new apartment rental units to the town At its Tuesday meeting, the Avon Town Council will take its first look at a conceptual design for a new community housing development. Though in its preliminary stages, the development, Swift Gulch, could bring over 40 new apartment rental units to the town. The Swift Gulch plot -- located north of I-70 on an approximately 2-acre building site on town-owned land -- has been contemplated by the town for housing since 2015. It was then identified as a priority in the town's 2021 Community Housing Plan. "Development of housing on the Swift Gulch property is the best opportunity to build new housing product on Town owned land. The Town of Avon Properties Plan identified development of Swift Gulch as a priority and it continues to be viewed as a prime property for new housing development," reads the recently-adopted Community Housing Plan. The plan also contemplates that the preliminary site and design analysis will take place in 2021 and 2022, including financial analysis and exploration of private and public partnerships. It has been identified that this property would be used for community rental housing for Eagle County employees. Since October, a stakeholder team -- comprised of 2575 Design Co, Stan Clauson Associates and JVA Consulting Engineers design professionals; council members; staff from Avon as well as from Vail and Eagle County -- has met multiple times to identify project goals and provide input on preliminary site designs. On Tuesday, the Town Council will review the concept plan that was built as a result of this process and provide feedback and confirmation of next steps. The concept plan, as included in the meeting's packet, identifies two site designs that emerged through this design charette process. One site design was recommended through this process and includes three buildings that would provide 42 apartment units. Under this option as well, a fourth building would be contemplated during future financial and cost analysis of the project. The preliminary building layout for this design option considers a mix of one-bedroom, two-bedroom and studio units. The option also outlines that each unit will have in-unit washers and dryers, covered outdoor patios and more. This site design also meets all seven goals for the project as defined by the group of stakeholders. These goals include providing efficient building and unit layouts while maximizing the site and unit count; having storage space, decks, views and common areas for residents as well as environmental goals around all-electric, passive solar design, electric vehicles and xeriscaping; minimizing operations and maintenance needs and more. In his recommendation in the packet, Town Manager Eric Heil writes that this option "achieves the highest density which is likely to be the most cost effective per square foot." Heil's recommendation continues that there are a "long list of design details yet to be fully addressed and determined" and that "design, cost modeling and financial planning would occur concurrently as this project moves forward." The plan outlines the next steps for town staff around project funding, stating that staff will develop a project pro-forma of project costs and projected revenues. Project costs will be established as the town hires a general contractor and establishes cost estimates for construction and financing; projected maintanence and operations costs; and the establishment of a reserve and replacement fund. Revenues from the project, according to Planning Director Matt Pielsticker's report in the packet, will be based on "rents which are affordable in relationship to the salaries of employees we expect will apply for housing in this project" as well as projected occupancy rates. Heil wrote in his recommendation that this planning will help ensure that the project financially breaks-even in the "near term." As identified in the community housing plan, Avon will also look for private and public partnerships to help finance this project. Previously, Heil said that the town was intending to explore partnerships with Eagle County and the town of Vail for this purpose. Moving forward, the immediate next steps for the project include further design and planning including schematic designs and design development as well as hiring a general contractor for pre-construction consultation, soil sampling and more. The town's plan considers construction beginning sometime in 2023 or 2024. The regular Avon Town Council meeting is scheduled for Tuesday, Feb. 22 at 5 a.m. both online via Zoom and in person at Avon Town Hall (100 Mikaela Way). The Swift Gulch concept plan is scheduled for discussion at 5:40 p.m. Register via Zoom for the meeting at Avon.org. _________________________________ The Town of Avon, Colorado, Is Soliciting This Request for Proposals (RFP) From Firms and/or Teams With Relevant Design Experience to Develop Plans for an Employee Housing Project at 500 Swift Gulch Road. Eventual Construction of This Project Forward Will Provide Employee Housing for the Town of Avon and Other Essential Governmental Employers. The Town Is Seeking Competitive Bids From Qualified Contractors to Provide Architectural, Engineering, and Site Planning Services for the Swift Gulch Housing Project. The Town Anticipates Owning This Employee Housing With the Potential to Partner With Other Local Government Entities. After the Site Planning, the Town May Desire a Phased Project Approach That Fits the Town of Avon's Financial Resources or May Desire an Accelerated Project Construction Schedule if the Town of Avon Secures Other Local Government Financial Partners. The Town Desires the Housing Construction to Incorporate Best Practices for Climate Action Goals and Strategies to the Extent Financially Feasible. Question Acceptance Deadline 08/20/2021 05:00 PM EDT Questions are submitted online No The method of Contractor Selection has not been Determined at this time. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Conceptual

Municipal

$1,000,000.00

Public - City

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
24
Active Projects
6
Bidding Soon
223
All Active Projects
94
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.