BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a library in Doylestown, Pennsylvania. Completed plans call for the renovation of a library.

1. These provisions shall apply to all work performed on the Project by the Contractor, and to all work performed on the Project by all Subcontractors. 2. The Contractor shall insert in each of his subcontracts all of the stipulations contained in these required provisions and any other stipulations as may be required. 3. Workmen may not be employed on the work except in accordance with classifications set forth in the decision of the Secretary. In the event that additional or different classifications are necessary, the procedure set forth in Section 7 of the Regulations shall be followed. 4. Workmen employed or working on the Project shall be paid unconditionally, regardless of whether any contractual relationship exists or the nature of any contractual relationship which may be alleged to exist between any Contractor, Subcontractor and workmen, not less than once a week without deduction or rebate, on any account, either directly or indirectly except authorized deductions, the full amounts due at the time of payment, computed at the rates applicable to the time worked in the appropriate classification. Nothing in the Contract, the Act, or the Regulations shall prohibit the payment of more than the general prevailing minimum wage rates as determined by the Secretary to any workmen on public work All questions must be submitted by noon seven calendar days prior to the due date Bucks County Free Library Doylestown Branch Low Slope Roof Replacement A security deposit (cash, certified check, cashier check or properly executed bid bond) for 5% is required. Performance and Payment Bonds are required in the amount of 100% of the contract amount. Maintenance Bond is required in the amount of 10% of the contract. Bidders are advised Prevailing Minimum Wage Rates, determined by the Secretary of Labor and Industry, must be paid to all workers employed on this project.

Award

Library

$820,440.00

Public - County

Renovation

7

13

4

3

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
467
Active Projects
203
Bidding Soon
4,122
All Active Projects
1,924
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 12, 2023

July 12, 2023

img_map_placeholder

150 S Pine St, Doylestown, PA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.