BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Garden City, Michigan. Completed plans call for site work for a playground / park / athletic field.

The Parks and Recreation Department of the City of Garden City, Michigan desires to install connector sidewalks and a thickened edge concrete sidewalk border around the existing playground within Helen Park. Helen Park is located between Deering Street and Helen Street north of Beechwood Avenue. The proposed sidewalk area is approximately 2,600 square feet of new 4" concrete sidewalk with a 4" aggregate base. The City is seeking proposals in response to this Request for Proposals (RFP) from a qualified team (Contractor) to provide all aspects of the construction of a non-supervised public park not to exceed $55,000 in total budget. The City of Garden City requires the final design that meets or exceeds all current federal ASTM standards and ADA requirements. The proposals shall include the costs of all delivered and installed materials associated with the concrete sidewalk. This is to include 2 - 6" pvc drain outlet pipes under the sidewalks for future interior drainage of the playground. The Supplier must supply direct supervision, all tools and equipment required to complete the installation shall be provided by the Supplier. The Supplier will be given sixty (60) calendar days to complete the proposed work once Notice to Proceed has been given by the City. Bidders must deposit, with their bid, surety in the form of a certified check, bank draft, or bid bond, in the sum of five percent (5%) of the amount of the proposal. The Owner reserves the right to waive any information or to reject any and/or all bids. Bidders may not withdraw their bid within 60 days after the date of the bid opening. Question Acceptance Deadline 12/14/2021 12:00 AM EST Questions are submitted online No - Insurance Required

Post-Bid

Playgrounds / Parks / Athletic Fields

$55,000.00

Public - City

Site Work

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
344
Active Projects
201
Bidding Soon
2,779
All Active Projects
1,107
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 21, 2021

January 20, 2022

March 21, 2022

img_map_placeholder

5837 Deering St, Garden City, MI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.