BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 5, 2021 at 8:00 PM

Updated April 16, 2025

Site work and environmental remediation for a mixed-use development in Arlington, Massachusetts. Completed plans call for site work for a road / highway; for environmental remediation for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

As of October 5, 2021. the project has been awarded with the amount of $923,344.59. Estimated Cost $1,200,000.00 Annually Roadway Management: Supply all labor, materials, equipment and supervision necessary for paving or reconstructing streets, curb, sidewalks and related work in various locations as required for a period of one year from date of contract The work to be performed will be located on various streets in the Town of Arlington. The work under this contract consists of furnishing all necessary labor, materials, equipment and services to complete roadway improvements. Work includes, but is not limited to mobilization; pavement reclamation, cold plane milling; excavating, grading and/or relocating sections of existing roadway; earth excavation; installing, adjusting, and/or remodeling drainage, sewer & water structures, and utility structures; installation of, removal of, and/or removal and resetting of concrete and/or bituminous concrete sidewalks, bituminous concrete berm, and/or granite curbing, and other associated and appurtenant work associated with the Town of Arlington Annual Road Rehabilitation Project including; line painting; crack sealing; landscaping; and other miscellaneous and incidental work items necessary to complete the work. All materials and work under this contract shall be in conformance with the latest Editions of: Massachusetts Department of Transportation (MassDOT) Standard Specifications for Highways and Bridges, Supplemental Specifications, and Standard Special Provisions Construction and Traffic Standard Details The Manual on Uniform Traffic Control Devices Massachusetts Architectural Access Board's (MAAB) Rules and Regulations The American Water Works Association's Standard for the Installation of Ductile-Iron Water Mains and Their Appurtenances The Standard Drawings for Signs and Support and the following Special Provisions contained herein and attached MHD Constructions Details for Curb Ramps and Bituminous Concrete Berm.

Award

Sidewalks / Parking Lot

$923,345.00

Public - City

Environmental Remediation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

112 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
550
Active Projects
148
Bidding Soon
4,145
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 25, 2021

October 25, 2021

Project location map

Multiple Locations, Arlington, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.