Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 25, 2025 at 8:00 PM
Updated August 26, 2025
Demolition, site work, paving and new construction of a bridge / tunnel in Tigard, Oregon. Design plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
This project will replace the existing bridge with a new bridge wide enough to accommodate pedestrians and cyclists (on both sides) along with vehicles. Environmental regulations will require a new bridge to be significantly higher and longer than the current bridge, which may necessitate some rework of the existing Fanno Creek Trail just west of the bridge. The creek greenway will be excavated to construct a large floodplain detention pond to mitigate the bridge project; the pond will store water during storms. As of August 25, 2025, this project in design. It is expected that this project will bid for a general contractor Spring 2026. Construction is expected to begin sometime in 2026.
Design
Bridges / Tunnels
$6,425,000.00
Public - City
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 5, 2022
June 1, 2026
SW Tigard St, Tigard, OR
Related To This Project
Tigard, OR
Bid Date: Feb 28 2023
Tigard, OR
Bid Date: Jun 08 2021
Tigard, OR
Bid Date: Jun 23 2022
Tigard, OR
Bid Date: Jun 07 2022
Tigard, OR
Bid Date: Jun 02 2022
Tigard, OR
Bid Date: Jun 22 2022
Tigard, OR
Bid Date: Apr 14 2022
Tigard, OR
Bid Date: May 04 2022
Tigard, OR
Bid Date: Mar 29 2022
Tigard, OR
Bid Date: Apr 26 2022
Tigard, OR
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
