Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 2, 2021 at 8:00 PM
Updated July 8, 2025
Site work for a civil project in Durham, North Carolina. Completed plans call for site work for a road / highway.
Durham Bike Lane Striping Project The City Council of the City of Durham reserves the right to reject any or all of the Bids. All bids must include a non-collusion affidavit. To ensure that all Bidders using the Purchasing Division's web site are kept up to date on any Addenda, changes, or information notices, please send an e-mail to todd.tingler@durhamnc.gov indicating your intention to prepare a Bid for the Project. Failure to complete this step may render your Bid as non-responsive. All questions and/or clarifications must be submitted in writing via the email prior to 5:00 PM, Tuesday, August 24, 2021. The City of Durham requires the Project to be completed in 240 calendar days from date of Notice to Proceed for Construction. No Bid shall be considered or accepted unless at the time of its filing the same shall be accompanied by a deposit of cash or a certified or cashier's check drawn on a bank or trust company insured by the Federal Deposit Insurance Corporation (FDIC), in an amount equal to five percent (5%) of the amount of the Bid. The check shall be made payable to the City of Durham. Said deposit shall guarantee that the Contract will be entered into by the successful Bidder if the award is made. Such deposit of cash or certified or cashier's check may be held by the City until the successful Bidder has executed and delivered the Contract Documents, including performance and payment bond. In lieu of the cash deposit or certified or cashier's check mentioned above, the Bidder may file a Bid bond in the same amount executed by a corporate surety authorized to execute such bonds in North Carolina and in the form attached to the Bidding Documents or on file with the Engineer. Bid bond forms enclosed as part of the Bidding. Documents must be properly executed at the time Bids are submitted before Bid will be considered. Properly executed Power of Attorney of the corporate surety's agent shall accompany such bond and be attached to the page provided therefore in the Bidding Documents. Bids shall be submitted under a condition of irrevocability, except as required by law, for a period of ninety (90) days after Bid opening. The City of Durham reserves the right to accept or reject any or all Bids. The Project consists of layout and installation/application of roadway markings and ground mounted signage establishing bike boulevards on twenty-nine streets throughout the City.
Post-Bid
Roads / Highways
$300,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 7, 2021
November 8, 2021
Multiple Locations, Durham, NC
Related To This Project
Durham, NC
Bid Date: Jul 22 2025
Durham, NC
--
Durham, NC
Bid Date: Jul 09 2025
Durham, NC
Bid Date: Jul 31 2025
Durham, NC
Bid Date: Aug 07 2025
Durham, NC
Bid Date: Jul 21 2025
Durham, NC
Bid Date: Sep 03 2025
Durham, NC
Bid Date: Jul 08 2025
Durham, NC
Bid Date: Jul 10 2025
Durham, NC
Bid Date: Nov 11 2020
Durham, NC
Bid Date: Jul 16 2025
Durham, NC
Bid Date: Jun 25 2025
Durham, NC
Bid Date: Jun 25 2025
Durham, NC
Bid Date: Oct 09 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
