Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published September 14, 2022 at 8:00 PM
Updated September 15, 2023
Site work for a water / sewer project in Herndon, Virginia. Completed plans call for site work for a water / sewer project.
Sealed bids are hereby solicited for construction of Sugarland Run South Stream Restoration located in Herndon, Virginia. The work shall include the following: Construction of approximately 1,100 linear feet of stream restoration in the Sugarland Run Stream, as well as 250 linear feet of three side intermittent tributaries within Town of Herndon property. Stream restoration will include but are not limited to constructed riffles, rock cross vanes, rock toe revetments, plunge pools and rock outfall channels. This is a lump sum contract. Contract length is 240 calendar days to date of Substantial Completion. All questions concerning the project shall be submitted in writing or by email to the attention of the Senior Civil Engineer of Public Works at publicworks@herndon-va.gov This office is the only point where information will be disseminated. All questions must be submitted no later than 5:00 p.m. on Thursday, August 11, 2022. Bid Security must accompany each proposal in accordance with Instruction to Bidders. Bids shall be binding for sixty (60) days. The Town of Herndon reserves the right to reject any and all bids, to waive informalities and irregularities in bidding, and to accept bids which are considered to be in the best interest of the town. The stream restoration site shall be accessed on Elden Street adjacent to Herndon Police Department. Access will utilize a small portion of NOVA Parks W&OD Bridle trail before re-entering Town of Herndon property. The stream restoration will be on Town of Herndon property. The Project is generally located at 38.9608 Latitude and -77.3700 Longitude on the Vienna, VA-MD USGS Quadrangle Map.
Award
Water / Sewer
$698,155.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed