BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 8, 2021 at 8:00 PM

Updated October 24, 2023

Site work for a water / sewer project in Toledo, Oregon. Completed plans call for site work for a water / sewer project.

Complete improvements include the cleaning of existing pipe(s), removing all obstructions, lining the identified pipe(s) and testing the liner for successful installation. Carefully prepare pipes for lining process. Install new cast in place manhole. Furnish and install new Cured in Place Pipe (CIPP) providing structural support of the existing pipes. Verify all existing taps and connections to the pipe to be cut open upon completion of liner installation. Seal edges of cuts at taps and connections to prevent water from getting between liner and existing pipe. Provide testing as required to confirm proper installation of CIPP. After installation, document condition of the pipe and liner by inspection with Closed Circuit Television (CCTV) camera (or similar) and provide recordings to Owner.

Bid Results

Water / Sewer

$224,333.00

Public - City

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 26, 2021

September 27, 2021

Project location map

Multiple Locations, Toledo, OR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.