BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a warehouse / distribution facility in Fowler, Colorado. Completed plans call for the construction of a warehouse / distribution facility; and for site work for a warehouse / distribution facility.

Qualified General Contractors are invited to bid on the construction of a concrete secondary containment structure to be constructed at the Colorado Department of Transportation (CDOT) Fowler facility located at 33936 Highway 167 Fowler, CO. The work will consist of the construction of walls, floors and a single pad to provide secondary containment around and under future vertical cylindrical tanks that will contain chemical de-icing materials. The floors will consist of one singularly poured tank pad surrounded by a tilted footer with a 2 ft x 2 ft sump located in the lowest portion of the footer. The containment structure will be constructed per CDOT provided Drawings. The "Dimensions and for Bid-Information-Only Quantities" Table presented on Sheet S1.0 of the drawing set shall be used for bidding purposes. The containment will maintain structural integrity to contain the liquid material in the structure in case of an accidental spillage or leakage of the product from the tanks. The work also includes installation of OHSA-compliant access/egress stairs that will be constructed per CDOT provided Drawings. Installation of a new electrical panel, including two 20-amp breakers, a 30-amp breaker and a convenience outlet, is required to be installed on the outer wall of the containment structure. Electrical service will be required to be brought to the containment structure in a 1 1/4 -inch conduit. This service is located on the adjacent containment structure. The electrical panel, sump and access stairs for this containment shall be located per the direction of site personnel. There are currently no tanks onsite therefore, the contractor will NOT be responsible for moving any tanks at this location. CDOT will remove any asphalt and concrete at the site prior to the construction of the containment. The contractor is responsible for following the recommendations set forth in the geotechnical report provided as part of the bid package for site preparation prior to construction, as well as the site finishing work in accordance with the Site Clearance and Restoration section. Davis Bacon prevailing wage rate requirements apply to this project. Appendix E - Applicable Prevailing Wage Rates provided with this advertisement set the prevailing wages for this project. Contractors will be required to pay their employees at weekly intervals, at or above the rates set in Appendix E and shall comply with the enforcement provisions of C.R.S. 24-92-209. The contractor will be required sign Appendix F - Contractor Wage Compliance Statement with each monthly pay applications certifying that all payments made to direct employees and subcontractors are made in accordance with the Davis-Bacon Act and C.R.S. 24-92-202 - Insurance Required

Award

Warehouse / Distribution

$129,982.00

Public - State/Provincial

New Construction, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
24
Bidding Soon
381
All Active Projects
168
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 17, 2021

December 17, 2021

img_map_placeholder

33936 State Hwy 167, Fowler, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.