BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 31, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a mixed-use development in Stevens Point, Wisconsin. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

The Work includes approximately 210 cubic yards of excavation common, 335 ton of 1-1/4" BAD, 64 ton of HMA pavement, 550 square feet of sidewalk, 330 feet of curb, storm sewer installation, removals, appurtenances, and miscellaneous items. No bid shall be considered unless accompanied by a bid bond equal to 5 percent (5%) of the total bid price payable to said City of Stevens Point as a guarantee that if the bid is accepted, the bidder will execute and file a contract within ten (10) days after such acceptance. All applicable charter and statutory provisions and ordinances are incorporated into the contract. The successful bidder shall be required to conform to all Federal, State and local safety requirements. The Board of Public Works reserves the right to reject any or all bids or to waive any informality in the bidding. Bids may be held by the Board of Public Works for a period not to exceed sixty (60) days from the date of opening of the bids for the purpose of reviewing the bids and investigating the qualifications of bidders, prior to awarding of the contract. Prequalification of bidders will not be required. The contract shall consist of asphalt and pavement removal, common excavation, sidewalk removal, curb removal, abandoning existing structure, installation of new curb and gutter, 1- 1/4" base aggregate, asphaltic binder and surface placement, new sidewalk, storm sewer installation, sign placement, traffic control and all incidental items thereto at the locations identified in the plans and these special provisions and as identified by the engineer or their duly authorized representative. The contractor shall be responsible for providing a traffic control plan and providing traffic control from the time contract work is commenced until the roadway can be opened to traffic; general cleanup including sweeping of the binder and removal of excess concrete is also required and shall be incidental to bid items included in the contract documents.

Award

Sidewalks / Parking Lot

$45,973.00

Public - City

Paving, Site Work

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
101
Active Projects
34
Bidding Soon
460
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 31, 2021

September 30, 2021

Project location map

1116 Main St, Stevens Point, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.