BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 16, 2022 at 8:00 PM

Updated October 24, 2023

Site work and paving for a mixed-use development in Stevens Point, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The Curb, Gutter, and Sidewalk Repair Program shall consist of saw cutting existing concrete sidewalk and curb & gutter, removal of sidewalk and curb & gutter, grading of the sub-base, installation of new curb & gutter and sidewalk, asphaltic patching adjacent to curb removal and replacement, landscaping repair, installation of detectable warning fields at all curb ramp locations, and traffic control during construction. The contractor shall be responsible for traffic control in accordance with the MUTCD. Traffic control shall be in place prior to starting work to protect the traveling public and to protect the repair or installation areas from the time the items are removed until the repair or new curb & gutter or sidewalk is completed and can be opened to vehicular or pedestrian traffic; general cleanup including sweeping of the street after the pavement is removed and placed is also required. Locations for the work items contained in this contract are appended to these contract documents

Bid Results

Sidewalks / Parking Lot

$200,207.00

Public - City

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
101
Active Projects
31
Bidding Soon
457
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 5, 2022

May 5, 2022

Project location map

Multiple Locations, Stevens Point, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.