Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 18, 2022 at 8:00 PM
Updated January 27, 2024
Renovation of an educational facility in East Hartford, Connecticut. Completed plans call for the renovation of a educational facility.
**As of July 18, 2022. The Project ahs been awarded to All State Construction but no awarded amount available.** East Hartford Board of Education is seeking an experienced and qualified contractor to replace the existing Tri-Gen Micro-Turbine Based Cogeneration Plant and Absorption Chiller with a new higher efficiency combined heat and power (CHP) Co-Generation system including a new high efficiency electric screw chiller. This project also includes a new standby Emergency Generator System consisting of two diesel fired generators and related electrical gear for 100% back-up power during a utility power outage. Both systems are located at the East Hartford High School, 869 Forbes Street, East Hartford, CT. It is the intent to award this project to a single qualified prime contractor.
Award
Educational
$300,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
