BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Sturgis, South Dakota. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Contract Award Date: Mar 02, 2022 Contract Award Number: 6982AF22C000016 Task/Delivery Order Number: Contractor Awarded Unique Entity ID (DUNS): 066191107 Contractor Awarded Unique Entity ID (SAM): Contractor Awarded Name: KOVILIC CONSTRUCTION COMPANY, INC. Contractor Awarded Address: Franklin Park, IL 60131-1233 USA Base and All Options Value (Total Contract Value): $3762255.00 This Is Not a Request for Bid Plans and Specifications Are Not Available During the Presolicitation Period Project Description: The project is on federal property managed by the Bureau of Land Management in west central South Dakota. It is an existing Back Country Byway road about five miles long. It begins about 300 feet north of the westbound Interstate 90 Entrance Ramp and continues north to State Highway 34 about 0.5 miles east of Sturgis, South Dakota. The existing road is entirely gravel surface. Proposed improvements include: 1. Pave the northernmost 900 feet of Horse Soldier Road with asphalt including the intersection with State Highway 34 2. Recondition the remaining 4.8 miles of existing road with new surface gravel and rehabilitate super elevation in curves 3. Re-align about 750 feet of roadway to create a safe perpendicular intersection with one access road 4. Recondition and place new surface gravel in eight parking pullouts 5. Recondition and place new surface gravel in the existing Alkali Trailhead Parking Area 6. Remove and replace five CMP culverts 7. Add new directional signage SIGNIFICANT QUANTITIES (Schedule A): o 20420-0000 Embankment Construction: 5,000 CUYD o 30202-2000 Roadway Aggregate, Method 2: 18,000 TON o 40301-0100 Asphalt Concrete Pavement, Type 1: 450 TON ESTIMATED PRICE RANGE: Between $2,000,000 and $5,000,000 CONSTRUCTION DURATION: Construction is anticipated between May 2022 and October 2022 The method of contractor selection has not been determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$3,762,255.00

Public - Federal

Paving, Site Work

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
5
Bidding Soon
63
All Active Projects
24
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 23, 2022

March 21, 2022

img_map_placeholder

To Be Determined, Sturgis, SD

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.