BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 15, 2022 at 7:00 PM

Updated January 25, 2024

Site work for a transportation facility in Chavies, Kentucky. Design plans call for site work for a transportation facility.

As of November 15, 2022, an engineer has been selected. A firm timeline for construction has not been disclosed. *The closed solicitation has been included below for reference: This document constitutes a Request for Proposals for a Professional Service Contract from qualified individuals and organizations to furnish those services as described herein for the Commonwealth of Kentucky, Department of Highways. County - Perry Route - New Route Item No. - 10-80100.00 Project Description - New improved access to Wendell Ford Airport Project Manager - Aric Skaggs, P.E. User Division - Highway Design Approximate Fee - $300,000 Preliminary Engineering & Environmental Services (Lump Sum) Project Funding - State Funds (SPP funds) Project Length - Approximately 2.0 miles The purpose of the project is to improve access to the Wendell H. Ford Airport in Hazard, Perry County, Kentucky. The need for this project arises from substandard conditions of the existing access road, including narrow lanes, little to no shoulders, steep grades, and slope failures. These geometric deficiencies limit fuel deliveries to the airport, especially during winter months when road conditions sometimes become impassable, forcing closure of the road and the airport. The road closure isolates area residents reliant on the road for access to KY-15, the principal arterial road that serves the area. DBE Requirement : None The selected Consultant will be required to review the previously completed planning study, conduct Preliminary Engineering studies to reaffirm or identify appropriate typical sections, utility impacts, environmental impacts, and right-of-way impacts for each studied alternate and provide a dependable cost estimate for each studied alternate. The selected Consultant may be required to provide engineering services to perform Final Roadway Design, which may be added to the contract by a Contract Modification when Preliminary Engineering is complete. First Selection: September 7, 2021 Final Selection: September 22, 2021 Pre-Design Conference: September 29, 2021 Consultant Fee Proposal: October 8, 2021 Contract Negotiations: October 20, 2021 Notice To Proceed: November 10, 2021 The method of contractor selection has not been determined at this time. KYDOT - RFP Engineering - New Improved Access to Wendell Ford Airport

Design

Transportation Terminals

$13,180,000.00

Public - State/Provincial

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
76
Bidding Soon
841
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 4, 2024

Project location map

1300 Wendell Ford Terminal Rd, Chavies, KY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.