BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 7, 2023 at 7:00 PM

Updated January 26, 2024

Site work and paving for a bridge / tunnel in Weeping Water, Nebraska. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The project work shall consist of furnishing all labor, materials and equipment to complete repairs to the Randolph Street Bridge. Repairs per the plans and specifications shall include removal and replacement of bridge stringers, abutment backwall reconstruction, cleaning and painting existing steel, steel walkway repairs, and patching of concrete abutments. No pre-bid meeting Work must be completed and bridge open by June 1st 2022. Questions should be directed to Brandon Roesler, Engineer, at 402-458-5666. Location / Site Directions: Weeping Water, Nebraska Completion Date: 06/01/2022

Award

Bridges / Tunnels

$205,569.00

Public - City

Paving, Site Work

10

7

5

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
139
Active Projects
89
Bidding Soon
931
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 8, 2021

September 20, 2021

Project location map

S Randolph St, Weeping Water, NE

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.