BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 20, 2021 at 8:00 PM

Updated June 12, 2025

Renovation of a fire / police facility in Lawrence, Massachusetts. Completed plans call for the renovation of a fire / police facility.

For Central Fire station Roof replacement The work applies to the Limit of Work areas noted on the Drawings. All work required without limiting the generality thereof includes all labor, materials, equipment, and services required to perform the work fully in the drawings and specifications and to provide a complete finished project and includes, but is not limited to, the following: 1. Roofing Demolition of the entire roof includes, but is not limited to: a. Completely strip, remove and legally dispose of all existing layers of bitumen and built-up roofing, and underlayment, including but not limited to all layers polyisocyanurate insulation, hot mopped asphalt adhesive, deteriorated wood blocking, metal flashing, fasteners, sealants, adhesives, mastics, and debris. The Contractor is hereby notified that the sealants and mastics in the roofing tested positive for asbestos. See spec. b. Removal and legally disposal of all existing skylights. c. Removal and legally disposal of unused roof top A/C units. d. Remove and dispose of all existing roof drains including, but not limited to: strainers, bowls, clamp rings, drain inserts, fasteners, adhesives, sealants and mastics. Carefully chip away enough of the existing concrete, or modify the existing metal deck to install the new drains. New EPDM Roofing Work on the entire roof incudes but is not limited to: a. Furnish and install a complete new fully adhered.060" EPDM membrane roofing system; including but not limited to: 1) Continuous .030" self-adhered vapor barrier. 2) On concrete decks - fully adhered polyisocyanurate insulation composite, with high-density polyisocyanurate cover board set in low rise urethane foam roofing adhesive. 3) On metal decks - fasten tapered insulation with coated screws and adhere the high density urethane over screws with low rise urethane foam roofing adhesive 4) 60 mil EPDM roofing membrane system fully adhered to cover board. 5) Mechanically attached 3/4" plywood at concrete curbs. 6) Self-Adhered EPDM membrane curb flashings and membrane flashing strips. 7) All EPDM roofing accessories to complete the roofing system. b. Furnish and install new wood blocking where existing blocking is deteriorated and as needed to meet the new insulation heights. The height of the blocking on each roof area shall match the highest point of the new tapered insulation at its highest point. c. Furnish and install all new premanufactured, prefinished, edge metal. d. Clad low tower walls above high roof, and upper floor wall masonry above roofs B and C with flat seam aluminum cladding. e. Furnish and install all new cast iron roof drains set in fast setting concrete mortar in concrete deck, and below deck clamps on metal deck, with all accessories. f. Roofing Warranty: Provide 25 year single-source total system EPDM Roofing System warranty, with 70mph wind speed coverage. g. Cutting of new reglets in wall and parapet above the lower terrace EPDM roofing, adding new EPDM flashing on the masonry and covering the flashing with new aluminum counterflashing. h. Replace the deteriorated rollers on the aluminum sliding door used to access the terrace and clean the threshold. i. Install galvanized ladder from the terrace roof to the high roof.

Post-Bid

Fire / Police

$245,000.00

Public - City

Renovation

10

15

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
585
Active Projects
331
Bidding Soon
4,290
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2021

October 1, 2021

Project location map

65 Lowell St, Lawrence, MA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.