Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 20, 2021 at 8:00 PM
Updated June 12, 2025
Renovation of a fire / police facility in Lawrence, Massachusetts. Completed plans call for the renovation of a fire / police facility.
For Central Fire station Roof replacement The work applies to the Limit of Work areas noted on the Drawings. All work required without limiting the generality thereof includes all labor, materials, equipment, and services required to perform the work fully in the drawings and specifications and to provide a complete finished project and includes, but is not limited to, the following: 1. Roofing Demolition of the entire roof includes, but is not limited to: a. Completely strip, remove and legally dispose of all existing layers of bitumen and built-up roofing, and underlayment, including but not limited to all layers polyisocyanurate insulation, hot mopped asphalt adhesive, deteriorated wood blocking, metal flashing, fasteners, sealants, adhesives, mastics, and debris. The Contractor is hereby notified that the sealants and mastics in the roofing tested positive for asbestos. See spec. b. Removal and legally disposal of all existing skylights. c. Removal and legally disposal of unused roof top A/C units. d. Remove and dispose of all existing roof drains including, but not limited to: strainers, bowls, clamp rings, drain inserts, fasteners, adhesives, sealants and mastics. Carefully chip away enough of the existing concrete, or modify the existing metal deck to install the new drains. New EPDM Roofing Work on the entire roof incudes but is not limited to: a. Furnish and install a complete new fully adhered.060" EPDM membrane roofing system; including but not limited to: 1) Continuous .030" self-adhered vapor barrier. 2) On concrete decks - fully adhered polyisocyanurate insulation composite, with high-density polyisocyanurate cover board set in low rise urethane foam roofing adhesive. 3) On metal decks - fasten tapered insulation with coated screws and adhere the high density urethane over screws with low rise urethane foam roofing adhesive 4) 60 mil EPDM roofing membrane system fully adhered to cover board. 5) Mechanically attached 3/4" plywood at concrete curbs. 6) Self-Adhered EPDM membrane curb flashings and membrane flashing strips. 7) All EPDM roofing accessories to complete the roofing system. b. Furnish and install new wood blocking where existing blocking is deteriorated and as needed to meet the new insulation heights. The height of the blocking on each roof area shall match the highest point of the new tapered insulation at its highest point. c. Furnish and install all new premanufactured, prefinished, edge metal. d. Clad low tower walls above high roof, and upper floor wall masonry above roofs B and C with flat seam aluminum cladding. e. Furnish and install all new cast iron roof drains set in fast setting concrete mortar in concrete deck, and below deck clamps on metal deck, with all accessories. f. Roofing Warranty: Provide 25 year single-source total system EPDM Roofing System warranty, with 70mph wind speed coverage. g. Cutting of new reglets in wall and parapet above the lower terrace EPDM roofing, adding new EPDM flashing on the masonry and covering the flashing with new aluminum counterflashing. h. Replace the deteriorated rollers on the aluminum sliding door used to access the terrace and clean the threshold. i. Install galvanized ladder from the terrace roof to the high roof.
Post-Bid
Fire / Police
$245,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 1, 2021
October 1, 2021
65 Lowell St, Lawrence, MA
Related To This Project
Lawrence, MA
Bid Date: Mar 24 2021
Lawrence, MA
Bid Date: Mar 17 2021
Lawrence, MA
Bid Date: May 12 2021
Lawrence, MA
Bid Date: May 05 2021
Lawrence, MA
Bid Date: Jul 08 2019
Lawrence, MA
Bid Date: Oct 07 2020
Lawrence, MA
Bid Date: Jun 12 2019
Lawrence, MA
--
Lawrence, MA
Bid Date: Sep 17 2021
Lawrence, MA
Bid Date: Jun 10 2025
Lawrence, MA
Bid Date: Jun 06 2025
Lawrence, MA
Bid Date: May 06 2025
Lawrence, MA
Bid Date: May 15 2025
Lawrence, MA
Bid Date: Apr 30 2025
Lawrence, MA
Bid Date: May 07 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
