BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 16, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a mixed-use development in Milwaukie, Oregon. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

SAFE/SSMP IMPROVEMENTS 40th Avenue: Reconstruct roadway surface on 40th Avenue from Harvey Street to King Road. Logus Road: Fill in sidewalk gaps, replace portions of existing sidewalk, remove barriers, and reconstruct roadway surface on Logus Road from 43rd Avenue to 49th Avenue. SSMP IMPROVEMENTS 42nd Avenue: Reconstruct roadway surface on 42nd Avenue from Monroe Street to King Road. WASTEWATER SYSTEM IMPROVEMENTS 38th Avenue Repair: Replacement recommended to address holes and a significant belly in the mainline that holds debris requiring quarterly flushing. The line also has two poorly constructed point repairs. MH 2120 - 2118: Length 253.6', Depth upstream 5.92', Depth downstream 5.67', Number of services 9, Diameter 8" 45th Court Repair: Repair of a failing upstream manhole which must be flushed regularly to clear debris build-up that blocks a service lateral. MH 3503 - 3316: Length 149.5', Depth upstream 8.5', Depth downstream 12.92', Number of services 3, Diameter 6" WATER SYSTEM IMPROVEMENTS Drake Street & 38th Avenue: Replace approximately 800 feet, upsize the existing cast iron 4-inch water main to 8-inch to improve fire flows in the neighborhood, and connect to the 8-inch water main on 40th Avenue. The project will include replacement of existing valves, reconnection of existing water services and hydrants, and pavement patching along the length of the pipe. As of August 16, 2022, this project is currently in the FY 2023-2028 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2025. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$3,947,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
134
Active Projects
66
Bidding Soon
955
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.