BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 23, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a mixed-use development in Milwaukie, Oregon. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

SAFE/SSMP IMPROVEMENTS 26th Avenue: Fill in sidewalk gaps on the street, and grind and pave new overlay to the street surface from Lake Road to Lake Village Apartments. 27th Avenue: Replace portions of existing sidewalk, remove ADA barriers, and grind and pave a new overlay to the street surface from Lake Road to Washington Street. Oak Street: Replace portions of existing sidewalk and repair or reconstruct asphalt pavement from Washington Street to Monroe Street. Washington Street: Fill in sidewalk gaps on both sides of the street, replace portions of existing sidewalk, remove ADA barriers, and reconstruct asphalt pavement from McLoughlin Boulevard to 35th Avenue. May require relocation of water and stormwater utilities in addition to construction of new water quality facilities. Washington Street Sewer Replacement: Replace sewer main from 34th Avenue to Sellwood Street. Both replacements would include service reconnection along the lengthy of the pipe. MH 2227 - 2226, Length 313', Depth upstream 12.58', Depth downstream 13.25', Number of services 7, Diameter 10". This project is required to address intruding roots and seal material which cause debris build-up requiring regular clearing. MH 2228 - 2227, Length 462.9', Depth 7.33', Upstream 12.58', Downstream number of services 19, Diameter 10". This project is required to address intruding roots and add a manhole in the middle of the line to ease maintance issues. Washington Street Storm Pipe Replacement - Phase II: Replace undersized storm pipe in Washington Street. As of June 23, 2022, this project is included in the City of Milwaukie's FY 2021-2026 CIP and construction is planned for FY2022 and FY 2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$5,196,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
134
Active Projects
67
Bidding Soon
946
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2023

Project location map

Multiple Locations, Milwaukie, OR

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.