Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, new construction and renovation of a civil project in Odessa, Texas. Completed plans call for the construction of a water / sewer project; for the renovation of a water / sewer project; and for site work for a water / sewer project.
**Project was awarded to Garney Companies, Inc. in the amount of $71,553,712.64 https://www.tdlr.texas.gov/TABS/Search/Project/TABS2022008028 Project Name: Water Treatment Plant Rehabilitation and Misc Upgrades Project Number: TABS2022008028 Facility Name: City of Odessa Water Treatment Plant Location Address: 851 W 42nd ST Odessa, TX 79764 Location County: Ector Start Date: 1/28/2022 Completion Date: 12/31/2024 Estimated Cost: $84,000,000 Type of Work: Renovation/Alteration Type of Funds: This project involves public funds, public land, or is a Federally funded roadway project. Scope of Work: Rehabilitation and upgrades to the City of Odessa Water Treatment Plant Square Footage: 766,656 ft 2 _____________________________________________________________________________ The project includes multiple rehabilitation efforts and upgrades to various process mechanical, building mechanical, electrical, supervisory control and data acquisition (SCADA), instrumentation and control, civil, structural, and architectural components at the City of Odessa Water Treatment Plant (WTP). The project also includes SCADA upgrades at other City-owned remote sites including the City of Odessa Bob Derrington Water Reclamation Plant (WRP), remote sites associated with WTP and WRP, Police Department and City Hall. Major work components include but are not limited to demolition of the existing Plant 1 flocculation and sedimentation basin, the City's caustic soda building, and other structures. New construction includes a chlorine room extension at the North Chemical Building, a new flocculation and sedimentation train, a new South Chemical Building, a new hydraulic relief line from the filters to Clearwell No. 1, and a new Electrical Building. Upgrades include rehabilitation of the plant filters, filter building mechanical and structural rehabilitation, replacement of pumps and electrical equipment at various miscellaneous pump stations located within the plant grounds, replacement of mechanical and electrical equipment at the Golder Pump Station, upgrades to the Administration Building control room, break room, restrooms, and ventilation system, and site grading and restoration (including new and repaved chemical delivery roadways).
Award
Water / Sewer
$71,553,713.00
Public - City
New Construction, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 21, 2021
December 20, 2021
811 W 42nd St, Odessa, TX
Related To This Project
Odessa, TX
Bid Date: Sep 13 2022
Odessa, TX
Bid Date: Sep 13 2022
Odessa, TX
Bid Date: Sep 13 2022
Odessa, TX
Bid Date: Mar 24 2022
Odessa, TX
Bid Date: Sep 20 2022
Odessa, TX
--
Odessa, TX
Bid Date: Sep 19 2022
Odessa, TX
--
Odessa, TX
--
Odessa, TX
--
Odessa, TX
--
Odessa, TX
Bid Date: Aug 10 2022
Odessa, TX
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.