Published January 18, 2022 at 7:00 PM

Updated November 15, 2023

Site work and renovation of a mixed-use development in Vanguard, Saskatchewan. Completed plans call for the renovation of a water / sewer project.

Tenders shall be for the provision of major upgrades to the Village of Vanguard distribution system. The upgrades include two distribution pumps, an emergency pump with a flow meters, valves and pipes. Main components of the Work include: Supply and installation of two (2) distribution pumps. Supply and installation of one (1) emergency pump. Supply variable frequency drive capable of running 20 hp, on 230V, three phase. Installation by electrical. Supply and installation of three (three) flow meters as shown in the drawings. Supply and installation of a pressure transducer level for the treated water reservoir. Supply and installation of pressure reducing valve. Supply and installation of pipe, fittings and valves for all connections required. Supply and installation of reaction blocks as shown in the drawings. Demolition and removal of existing reaction concrete blocks, piping, fittings and pumps. Provide temporary pump and connections to maintain the distribution system in operation during installations. Disinfection of newly installed pipe and fittings. Pressure and leakage testing for piping, valves, services and appurtenances. System commissioning and the provision of record drawings and operation and maintenance manuals Miscellaneous site work. Documents are available at www.sasktenders.ca

Award

Water / Sewer

$129,495.00

Public - City

Renovation, Site Work

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Execution and Closeout Requirements, Examination and Preparation, Execution, Erection, Closeout Submittals, Warranties, Spare Parts, Commissioning
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Tiling, Painting and Coating
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Steam and Condensate Piping and Pumps, Steam and Condensate Heating Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Power Filters and Conditioners, Capacitors, Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Trenching
Division 33 - Utilities

Division 33 - Utilities

Electrical Utilities, Utility Substations
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Gas and Vapor Process Piping
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Lifting Devices, Clamps

Find More Local Projects

Within 75 Miles of This Project
1
Active Projects
0
Bidding Soon
19
All Active Projects
10
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 9, 2021

December 23, 2021

img_map_placeholder

Multiple Locations, Vanguard, SK

Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Distribution System Upgrades - Process Mechanical

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.