BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a civil project in Hialeah, Florida. Conceptual plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; bridge / tunnel; and for outdoor lighting for a road / highway.

As of April 4, 2022, information regarding award and award date has not been disclosed. Although a firm timeline for construction has not been determined, construction is not expected to start prior to fiscal year 2024 *The closed solicitation has been included below for reference: Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) This is a Business Development Initiative. District : 06 Selection Method : Letter of Response and Abbreviated Technical Proposal SR 916/NW 135 St & NW 136 St from W. of NW 30 Ave TRC Members (Subject to Change) : Hector Di Donato Ileana Alvarez Ryan Raghunandan RRR Project along SR 916/NW 135 ST & NW 136 ST FROM W OF NW 30 AVE TO W OF NW 27 AVE. Project improvements include: milling and resurfacing of existing roadway pavement, modification of geometry at the northwest corner of the intersection of 136th Street and 27th Ave, to connect NW 136th Street to Opa-Locka Blvd., new drainage improvements, repairing/replacing damaged inlet tops, drainage structures relocation, utility coordination, updating existing deficient pedestrian features such as sidewalks, pedestrian curb ramps, detectable warning surfaces, adding new pedestrian crossings, and pedestrian crossing signs and plaques. Improvements also include signing and pavement markings, signalization, ITS, lighting, and landscaping. Transit Coordination with MDC is expected as this project includes the relocation of a bus stop. Financial Management Number(s) 447805-1-32-01 Longlist Date/Time 9/15/2021 Shortlist Selection Date/Time 9/20/2021 Phase II Submittal Deadline Date/Time 10/06/2021 Final Selection Date/Time 11/01/2021 Negotiations Period Begin Date 11/09/2021 Negotiations Period Ending Date 12/31/2021 The method of contractor selection has not been determined at this time. FDOT - RFP Engineering - SR 976/ SW 40 St/ Bird Road from East of SR 826 to SW 58 Ave

Conceptual

Roads / Highways

$2,477,863.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
50
Bidding Soon
1,102
All Active Projects
497
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.