Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 14, 2022 at 7:00 PM
Updated January 26, 2024
Site work, paving and outdoor lighting for a civil project in Hialeah, Florida. Conceptual plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; bridge / tunnel; and for outdoor lighting for a road / highway.
As of April 4, 2022, information regarding award and award date has not been disclosed. Although a firm timeline for construction has not been determined, construction is not expected to start prior to fiscal year 2024 *The closed solicitation has been included below for reference: Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) This is a Business Development Initiative. District : 06 Selection Method : Letter of Response and Abbreviated Technical Proposal SR 916/NW 135 St & NW 136 St from W. of NW 30 Ave TRC Members (Subject to Change) : Hector Di Donato Ileana Alvarez Ryan Raghunandan RRR Project along SR 916/NW 135 ST & NW 136 ST FROM W OF NW 30 AVE TO W OF NW 27 AVE. Project improvements include: milling and resurfacing of existing roadway pavement, modification of geometry at the northwest corner of the intersection of 136th Street and 27th Ave, to connect NW 136th Street to Opa-Locka Blvd., new drainage improvements, repairing/replacing damaged inlet tops, drainage structures relocation, utility coordination, updating existing deficient pedestrian features such as sidewalks, pedestrian curb ramps, detectable warning surfaces, adding new pedestrian crossings, and pedestrian crossing signs and plaques. Improvements also include signing and pavement markings, signalization, ITS, lighting, and landscaping. Transit Coordination with MDC is expected as this project includes the relocation of a bus stop. Financial Management Number(s) 447805-1-32-01 Longlist Date/Time 9/15/2021 Shortlist Selection Date/Time 9/20/2021 Phase II Submittal Deadline Date/Time 10/06/2021 Final Selection Date/Time 11/01/2021 Negotiations Period Begin Date 11/09/2021 Negotiations Period Ending Date 12/31/2021 The method of contractor selection has not been determined at this time. FDOT - RFP Engineering - SR 976/ SW 40 St/ Bird Road from East of SR 826 to SW 58 Ave
Conceptual
Roads / Highways
$2,477,863.00
Public - State/Provincial
Outdoor Lighting, Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 3, 2024
FL-916, Hialeah, FL
Related To This Project
Hialeah, FL
Bid Date: Nov 29 2022
Hialeah, FL
Bid Date: Dec 01 2022
Hialeah, FL
Bid Date: Jan 25 2023
Hialeah, FL
Bid Date: Feb 23 2024
Hialeah, FL
--
Hialeah, FL
--
Hialeah, FL
Bid Date: Jan 18 2023
Hialeah, FL
Bid Date: Jan 18 2023
Hialeah, FL
--
Hialeah, FL
--
Hialeah, FL
--
Hialeah, FL
--
Hialeah, FL
Bid Date: Dec 15 2022
Hialeah, FL
Bid Date: Dec 16 2022
Hialeah, FL
Bid Date: Nov 30 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
