BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Tipton, Indiana. Working plans call for the renovation of a educational facility.

The owner has selected a Construction Manager. The 2022 Elementary School Renovation Project is for the renovation, update and or remodel of the existing Tipton Elementary School. The 2022 Elementary School Renovation Project is currently anticipated to include, but not limited to, space reconfiguration, including, but not limited to, areas involving the cafeteria and media center, replacement of interior finishes, including, but not limited to, all or any portion of the floor, wall and ceiling finishes and coverings, updating of all or any portion of the telecommunications and technology infrastructure and acquisition of furniture and other equipment. Include separate fees for Pre-Construction and Construction Phase services to be performed by the CMC based on the proposed 2022 Elementary School Renovation Project scope. A. Preconstruction Services: a. The proposed fixed fee for Pre-Construction Servicesto include: Planning and Scheduling, Estimating, Value Management, Quality Review, Preparing Contracts for Construction, Life-Cycle Costing, Front End Specifications, Bid Procurement, Tracking Costs Against the Budget, Design Meetings and all Staffing Costs. B. Construction Services: a. Provide a fixed fee for Construction Services to include: Cost of all on-site and off-site CMC staff that will be working on the 2022 Elementary School Renovation Project. Provide an Effort Schedule that identifies the estimated man hours charged each month by each staff position over the course of the 2022 Elementary School Renovation Project. These hours should be multiplied by an hourly billing rate that include wages and customary fringes per the Effort Schedule. In addition to a lump sum staffing cost, provide a monthly staffing cost that can be added to, or subtracted from, the lump sum cost once the construction duration has been determined. b. Provide a fee percentage for overhead and profit that will be multiplied by the Cost of the Work. C. The Proposal does not need to identify the predicted costs for the following (these items will be considered reimbursable expenses). Items to be included in the General Conditions will be: safety equipment, first aid supplies, handrails and toe boards, opening protection, fire extinguishers, temporary fencing, storage rental, temporary toilets, temporary stairs, temporary enclosures, temporary barricades, project signs, bulletin boards, on-site equipment, printing, telephone expenses, temporary power service, temporary water service, temporary heating service, heating energy charges, temporary wiring, temporary lighting, regular clean-up, trash dumpsters, dump permit and fees, traffic control, temporary roads, roadway maintenance, job trailer/trailer utilities, material testing, project website, permitting and all other jobsite construction-related miscellaneous expenses excluding construction manager staffing costs. The CMC's employee expenses shall be included within the fixed CMC Fee as previously noted above in Item III.B.a. D. Items to be completed by other Consultants (Paid directly by the Owner): - Architecture and Engineering - Site Surveys - Soil Explorations E. The CMC Contract shall be based on the modified AIA A133 - 2019 Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price and the modified AIA A201 - 2017 General Conditions of the Contract for Construction, which are both attached to this 2022 Elementary School Renovation Project RFP. E. The cost of work for the CMC Services is to be based on $4,600,000. Construction June, 2022- June, 2023

Pre-Construction/Negotiated

Educational

$4,600,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
177
Active Projects
119
Bidding Soon
1,015
All Active Projects
494
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 21, 2021

June 1, 2022

img_map_placeholder

1099 S Main St, Tipton, IN


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.