Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 18, 2023 at 7:00 PM

Updated January 29, 2024

Renovation of an educational facility in Tipton, Indiana. Working plans call for the renovation of a educational facility.

The owner has selected a Construction Manager. an Effort Schedule that identifies the estimated man hours charged each month by each staff position over the course of the 2023 Middle School Renovation Project. These hours should be multiplied by an hourly billing rate that include wages and customary fringes per the Effort Schedule. In addition to a lump sum staffing cost, provide a monthly staffing cost that can be added to, or subtracted from, the lump sum cost once the construction duration has been determined. EC Meeting (review proposals) September 28, 2021 at 6:00 PM (EDT) EC Meeting (interviews, if required) October 5, 2021 at 5:00 PM (EDT) Board Approval of CMC October 12, 2021 The cost of work for the CMC Services is to be based on $4,600,000 The Owner reserves the right to terminate the 2023 Middle School Renovation Project RFP process for any reason, to be the sole judge of the Proposals submitted, to reject any and all Proposals, and to waive any informalities or irregularities in any of the Proposals. The Owner creates no obligation, expressed or implied, of any kind or description in issuing this 2023 Middle School Renovation Project RFP or receiving a Proposal. Neither this 2023 Middle School Renovation Project RFP nor any Proposal shall be construed as a legal offer. The 2023 Middle School Renovation Project is for the renovation, update and or remodel of the existing Tipton Middle School. The 2023 Middle School Renovation Project is currently anticipated to include, but not be limited to, renovations throughout various areas of the existing Tipton Middle School, including, but not limited to, all or any portion of the planetarium, the large group instruction room, the gymnasium, the science labs and classrooms, installation of new casework cabinetry, interior finishes and coverings, acquisition of furniture, replacement of demountable walls with permanent walls and re-coring of doors.

Pre-Construction/Negotiated

Educational

$4,600,000.00

Public - County

Renovation

3

3

2

8

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 21, 2021

June 1, 2023

Project location map

817 S Main St, Tipton, IN

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed